Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 2836 | Biological Products Exc. Diagnostic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0521 # 06 Y:2003 | 06 | 2003 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $48,290 | $175,000 | Not Implemented |
CO0521 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,650 | $3,532 | Not Implemented |
CO0521 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $200 | Implemented |
CO0521 # 03 Y:2003 | 03 | 2003 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,010 | $1,400 | Implemented |
CO0521 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,840 | $5,100 | Not Implemented |
CO0521 # 01 Y:2003 | 01 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $65,190 | $82,000 | Not Implemented |
AM0431 # 02 Y:2003 | 02 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,030 | $11,900 | Not Implemented |
AM0431 # 11 Y:2003 | 11 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $760 | $0 | Implemented |
AM0431 # 10 Y:2003 | 10 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $780 | $1,520 | Not Implemented |
AM0431 # 08 Y:2003 | 08 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,150 | $0 | Implemented |
AM0431 # 01 Y:2003 | 01 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $23,400 | $240 | Implemented |
AM0431 # 03 Y:2003 | 03 | 2003 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $3,480 | $5,640 | Implemented |
AM0431 # 04 Y:2003 | 04 | 2003 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,100 | $0 | Implemented |
AM0431 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,460 | $1,790 | Implemented |
AM0431 # 06 Y:2003 | 06 | 2003 | REDUCE HEAT GAIN BY WINDOW TINTING | $1,720 | $4,460 | Not Implemented |
AM0431 # 07 Y:2003 | 07 | 2003 | PAY BILLS ON TIME TO AVOID LATE FEES | $750 | $0 | Implemented |
AM0431 # 09 Y:2003 | 09 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,130 | $0 | Implemented |
LM0046 # 09 Y:2003 | 09 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $17,717 | $120 | Not Implemented |
LM0046 # 10 Y:2003 | 10 | 2003 | RECOVER AND REUSE COOLING WATER | $40,647 | $5,000 | Implemented |
LM0046 # 11 Y:2003 | 11 | 2003 | UTILIZE OUTSIDE CONTRACTING | $56,838 | $11,800 | Not Implemented |
LM0046 # 12 Y:2003 | 12 | 2003 | UTILIZE OUTSIDE CONTRACTING | $234,229 | $100,000 | Not Implemented |
LM0046 # 13 Y:2003 | 13 | 2003 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $230,000 | $336,269 | Implemented |
LM0046 # 08 Y:2003 | 08 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,802 | $17,200 | Not Implemented |
LM0046 # 07 Y:2003 | 07 | 2003 | INSTALL OCCUPANCY SENSORS | $2,760 | $521 | Implemented |
LM0046 # 06 Y:2003 | 06 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,314 | $0 | Implemented |