Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 284 | Soap, Cleaners, And Toilet Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0621 # 02 Y:2021 | 02 | 2021 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,887 | $10,000 | Implemented |
SD0621 # 01 Y:2021 | 01 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,319 | $0 | Implemented |
MI0397 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,361 | $40 | Implemented |
MI0397 # 05 Y:2021 | 05 | 2021 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,631 | $40 | Implemented |
IP0149 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $982 | $120 | Implemented |
IP0149 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $330 | $450 | Implemented |
IP0149 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $416 | $380 | Implemented |
IP0149 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,671 | $95 | Implemented |
SD0611 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $30,193 | $22,050 | Implemented |
SD0611 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $203 | $387 | Implemented |
SD0611 # 06 Y:2021 | 06 | 2021 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $45,722 | $186,400 | Implemented |
SD0611 # 07 Y:2021 | 07 | 2021 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,308 | $6,000 | Implemented |
LE0505 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,651 | $10,100 | Implemented |
LE0505 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,439 | $31,000 | Implemented |
LE0505 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $62,020 | $55,000 | Implemented |
LE0505 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,327 | $20,855 | Implemented |
LE0505 # 06 Y:2021 | 06 | 2021 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $48,123 | $90,000 | Implemented |
LE0505 # 01 Y:2021 | 01 | 2021 | REPAIR OR REPLACE STEAM TRAPS | $72,824 | $26,000 | Implemented |
OK1046 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $827 | $0 | Implemented |
OK1046 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,027 | $38,688 | Implemented |