IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2841 Soap And Other Detergents
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0505 # 07 Y:2021 07 2021 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $51,715 $200,000 Not Implemented
LE0505 # 06 Y:2021 06 2021 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $48,123 $90,000 Implemented
LE0505 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,327 $20,855 Implemented
LE0505 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $62,020 $55,000 Implemented
LE0505 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,439 $31,000 Implemented
LE0505 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,651 $10,100 Implemented
LE0505 # 01 Y:2021 01 2021 REPAIR OR REPLACE STEAM TRAPS $72,824 $26,000 Implemented
LE0388 # 02 Y:2015 02 2015 USE RADIANT HEATER FOR SPOT HEATING $11,147 $21,250 Not Implemented
LE0388 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $272 $1,200 Implemented
LE0388 # 07 Y:2015 07 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,735 $9,703 Not Implemented
LE0388 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,432 $16,500 Not Implemented
LE0388 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,333 $20,147 Implemented
LE0388 # 04 Y:2015 04 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,556 $3,052 Not Implemented
LE0388 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $1,000 Implemented
LE0388 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,857 $1,520 Implemented
RU0096 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,050 $2,500 Not Implemented
RU0096 # 02 Y:1990 02 1990 REPAIR AND ELIMINATE STEAM LEAKS $805 $0 Implemented
RU0096 # 03 Y:1990 03 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,071 $0 Not Implemented
RU0096 # 04 Y:1990 04 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $299 $64 Not Implemented
RU0096 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $888 $0 Implemented
RU0096 # 06 Y:1990 06 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $73 $94 Not Implemented
RU0096 # 07 Y:1990 07 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,213 $70 Implemented
RU0096 # 08 Y:1990 08 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,145 $373 Not Implemented
RU0096 # 09 Y:1990 09 1990 USE MINIMUM STEAM OPERATING PRESSURE $4,150 $0 Not Implemented