Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
132
matching recommendationsSIC | 2842 | Polishes And Sanitation Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0218 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,565 | $480 | Not Implemented |
LE0218 # 03 Y:2005 | 03 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,249 | $1,250 | Not Implemented |
LE0218 # 02 Y:2005 | 02 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,740 | $3,000 | Not Implemented |
LE0218 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,038 | $1,200 | Not Implemented |
LE0218 # 01 Y:2005 | 01 | 2005 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $39,290 | $600 | Not Implemented |
LE0218 # 05 Y:2005 | 05 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $3,530 | $480 | Not Implemented |
NC0277 # 06 Y:2004 | 06 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,049 | $1,000 | Implemented |
NC0277 # 03 Y:2004 | 03 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,330 | $6,680 | Implemented |
NC0277 # 01 Y:2004 | 01 | 2004 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $40,000 | $1,000 | Not Implemented |
NC0277 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $750 | $782 | Implemented |
NC0277 # 02 Y:2004 | 02 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $2,250 | $710 | Implemented |
NC0277 # 05 Y:2004 | 05 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,387 | $1,900 | Not Implemented |
IA0314 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $766 | $130 | Not Implemented |
IA0314 # 07 Y:2003 | 07 | 2003 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $491 | $520 | Implemented |
IA0314 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $872 | $30 | Implemented |
IA0314 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $443 | $238 | Implemented |
IA0314 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,483 | $26,776 | Not Implemented |
IA0314 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,950 | $267 | Implemented |
IA0314 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,549 | $7,100 | Not Implemented |
WI0361 # 02 Y:2000 | 02 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $14,677 | $45,000 | Not Implemented |
WI0361 # 01 Y:2000 | 01 | 2000 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $25,500 | $0 | Not Implemented |
WI0361 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,555 | $1,380 | Not Implemented |
WI0361 # 05 Y:2000 | 05 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $894 | $0 | Not Implemented |
WI0361 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $984 | $3,740 | Implemented |
WI0361 # 06 Y:2000 | 06 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $649 | $0 | Not Implemented |