IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
Reset
SIC 2843 Surface Active Agents
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0832 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,751 $40,000 Implemented
UD0832 # 02 Y:2011 02 2011 DISCONNECT BALLASTS $2,570 $250 Implemented
UD0832 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,419 $39,141 Implemented
UD0832 # 08 Y:2011 08 2011 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,424 $500 Implemented
UD0832 # 12 Y:2011 12 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,554 $5,000 Not Implemented
UD0832 # 09 Y:2011 09 2011 RECOVER WASTE HEAT FROM EQUIPMENT $25,624 $5,000 Not Implemented
UD0832 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,473 $16,265 Not Implemented
DL0018 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,200 $16,000 Not Implemented
DL0018 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $425,000 $120,000 Implemented
DL0018 # 02 Y:2008 02 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $207,000 $250,000 Implemented
DL0018 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $188,000 $108,000 Implemented
DL0018 # 04 Y:2008 04 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $166,310 $35,000 Implemented
DL0018 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $141,700 $107,400 Not Implemented
DL0018 # 06 Y:2008 06 2008 UPGRADE OBSOLETE EQUIPMENT $102,500 $300,000 Not Implemented
DL0018 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $56,800 $129,000 Not Implemented
DL0018 # 08 Y:2008 08 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $44,400 $35,000 Not Implemented
DL0018 # 10 Y:2008 10 2008 USE SOLAR HEAT TO HEAT WATER $26,000 $175,000 Not Implemented
DL0018 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,300 $183,000 Implemented
DL0018 # 12 Y:2008 12 2008 REDUCE VENTILATION AIR $5,870 $0 Implemented
UD0760 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,006 $1,250 Implemented
UD0760 # 04 Y:2007 04 2007 DEVELOP A REPAIR/REPLACE POLICY $3,677 $13,959 Implemented
UD0760 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $4,030 $2,760 Implemented
UD0760 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $10,167 $6 Implemented
UD0760 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,886 $6,000 Implemented
UD0760 # 09 Y:2007 09 2007 USE PHOTOCELL CONTROLS $517 $105 Not Implemented