IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 2843 Surface Active Agents
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0760 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,153 $2,634 Not Implemented
UD0760 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,886 $6,000 Implemented
UD0760 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,006 $1,250 Implemented
UD0760 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $4,030 $2,760 Implemented
UD0760 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,480 $0 Implemented
UD0760 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $10,167 $6 Implemented
UD0736 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $14,596 $6,878 Not Implemented
UD0736 # 01 Y:2006 01 2006 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $511,635 $1,058,400 Not Implemented
UD0736 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $151,099 $230,000 Implemented
UD0736 # 03 Y:2006 03 2006 REPAIR AND ELIMINATE STEAM LEAKS $36,074 $28,000 Implemented
UD0736 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $35,184 $14,041 Implemented
UD0736 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32,384 $28,000 Implemented
UD0736 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $29,264 $40,000 Implemented
UD0736 # 08 Y:2006 08 2006 INSULATE FEEDWATER TANK $12,187 $6,825 Implemented
UD0736 # 09 Y:2006 09 2006 REPAIR OR REPLACE STEAM TRAPS $11,892 $240 Implemented
UD0736 # 10 Y:2006 10 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,947 $15,000 Not Implemented
UD0736 # 11 Y:2006 11 2006 TREAT AND REUSE RINSE WATERS $9,788 $10,000 Not Implemented
UD0736 # 12 Y:2006 12 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,612 $26,000 Implemented
UD0736 # 13 Y:2006 13 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,098 $0 Implemented
UD0736 # 14 Y:2006 14 2006 UPGRADE CONTROLS ON COMPRESSORS $4,542 $0 Not Implemented
UD0736 # 15 Y:2006 15 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,790 $0 Not Implemented
UD0736 # 16 Y:2006 16 2006 REPAIR AND ELIMINATE STEAM LEAKS $1,390 $2,800 Not Implemented
UD0483 # 05 Y:1996 05 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,668 $1,000 Not Implemented
UD0483 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,894 $5,615 Not Implemented
UD0483 # 03 Y:1996 03 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,498 $-6,800 Not Implemented