Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
55
matching recommendationsSIC | 2843 | Surface Active Agents |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0934 # 08 Y:2015 | 08 | 2015 | REDUCE VENTILATION AIR | $11,488 | $18,984 | Not Implemented |
UD0934 # 01 Y:2015 | 01 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $51,417 | $0 | Not Implemented |
UD0934 # 05 Y:2015 | 05 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,084 | $2,000 | Implemented |
UD0934 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,235 | $5,300 | Not Implemented |
UD0934 # 03 Y:2015 | 03 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $250 | $224 | Implemented |
UD0934 # 02 Y:2015 | 02 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,375 | $0 | Not Implemented |
UD0934 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,944 | $75,059 | Implemented |
UD0934 # 10 Y:2015 | 10 | 2015 | INSTALL OCCUPANCY SENSORS | $1,058 | $330 | Implemented |
UD0934 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,672 | $18,125 | Not Implemented |
UD0934 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,363 | $2,700 | Not Implemented |
UD0832 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,473 | $16,265 | Not Implemented |
UD0832 # 10 Y:2011 | 10 | 2011 | REPAIR OR REPLACE STEAM TRAPS | $14,246 | $2,000 | Not Implemented |
UD0832 # 12 Y:2011 | 12 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,554 | $5,000 | Not Implemented |
UD0832 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $986 | $500 | Implemented |
UD0832 # 09 Y:2011 | 09 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,624 | $5,000 | Not Implemented |
UD0832 # 04 Y:2011 | 04 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,419 | $39,141 | Implemented |
UD0832 # 06 Y:2011 | 06 | 2011 | UPGRADE OBSOLETE EQUIPMENT | $4,243 | $4,728 | Implemented |
UD0832 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $1,977 | $1,063 | Implemented |
UD0832 # 02 Y:2011 | 02 | 2011 | DISCONNECT BALLASTS | $2,570 | $250 | Implemented |
UD0832 # 11 Y:2011 | 11 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,335 | $2,620 | Not Implemented |
UD0832 # 08 Y:2011 | 08 | 2011 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $5,424 | $500 | Implemented |
UD0832 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,751 | $40,000 | Implemented |
UD0760 # 08 Y:2007 | 08 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $563 | $48 | Implemented |
UD0760 # 04 Y:2007 | 04 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $3,677 | $13,959 | Implemented |
UD0760 # 01 Y:2007 | 01 | 2007 | INSULATE BARE EQUIPMENT | $10,167 | $6 | Implemented |