IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

234

matching recommendations
Reset
SIC 2844 Toilet Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0464 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,873 $35,445 Implemented
NC0464 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79 $110 Implemented
LE0347 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,060 $40 Implemented
LE0347 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,654 $1,000 Implemented
LE0347 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $653 $2,000 Implemented
LE0347 # 05 Y:2012 05 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,309 $20,000 Implemented
LE0347 # 06 Y:2012 06 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $10,156 $16,300 Implemented
LE0347 # 08 Y:2012 08 2012 REPAIR AND ELIMINATE STEAM LEAKS $475 $675 Implemented
LL0296 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $116,005 $24,680 Implemented
LL0296 # 04 Y:2008 04 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,169 $2,120 Implemented
LL0296 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,916 $1,750 Implemented
SF0348 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $811 $0 Implemented
SF0348 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $865 $2,974 Implemented
SF0348 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,324 $16,819 Implemented
SF0348 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $1,020 Implemented
UF0370 # 01 Y:2005 01 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,736 $1,212 Implemented
UF0370 # 03 Y:2005 03 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $20,435 $56,000 Implemented
UF0370 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $4,053 $1,317 Implemented
UF0370 # 09 Y:2005 09 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $47,299 $130,000 Implemented
UF0370 # 11 Y:2005 11 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,313 $0 Implemented
MI0076 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,535 $1,370 Implemented
MI0076 # 04 Y:2004 04 2004 $3,936 $6,000 Implemented
MI0076 # 06 Y:2004 06 2004 $45,000 $23,400 Implemented
UU0049 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,222 $14,385 Implemented
MI0049 # 01 Y:2002 01 2002 $1,206,000 $100 Implemented