Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
488
matching recommendationsSIC | 2844 | Toilet Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0025 # 01 Y:2020 | 01 | 2020 | INSULATE BARE EQUIPMENT | $657 | $440 | Implemented |
TR0025 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,326 | $1,145 | Implemented |
TR0025 # 03 Y:2020 | 03 | 2020 | USE OPTIMUM THICKNESS INSULATION | $1,067 | $830 | Implemented |
TR0025 # 04 Y:2020 | 04 | 2020 | REPAIR AND ELIMINATE STEAM LEAKS | $1,683 | $130 | Implemented |
TR0025 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $371 | $676 | Implemented |
TR0025 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,497 | $9,060 | Implemented |
LE0492 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,779 | $3,520 | Not Implemented |
LE0492 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,071 | $22,500 | Implemented |
LE0492 # 03 Y:2020 | 03 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,415 | $6,000 | Not Implemented |
LE0492 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,255 | $2,500 | Not Implemented |
LE0492 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,434 | $5,800 | Not Implemented |
LE0492 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,300 | $8,123 | Implemented |
LE0492 # 07 Y:2020 | 07 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,220 | $17,000 | Not Implemented |
AS0479 # 01 Y:2020 | 01 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $20,215 | $200 | Implemented |
AS0479 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,892 | $111,826 | Not Implemented |
AS0479 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,108 | $6,016 | Implemented |
AS0479 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,979 | $1,639 | Implemented |
AS0479 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,834 | $330 | Implemented |
AS0479 # 06 Y:2020 | 06 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,794 | $7,400 | Implemented |
AS0479 # 07 Y:2020 | 07 | 2020 | INSTALL OCCUPANCY SENSORS | $1,596 | $4,600 | Not Implemented |
AS0479 # 08 Y:2020 | 08 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $60 | $281 | Not Implemented |
AS0475 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,577 | $20,083 | Not Implemented |
AS0475 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,094 | $5,938 | Implemented |
AS0475 # 03 Y:2019 | 03 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,779 | $895 | Implemented |
AS0475 # 04 Y:2019 | 04 | 2019 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $2,515 | $7,906 | Not Implemented |