Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
752
matching recommendationsSIC | 285 | Paints And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0211 # 06 Y:2001 | 06 | 2001 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,631 | $0 | Implemented |
NC0211 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,506 | $1,239 | Not Implemented |
NC0211 # 08 Y:2001 | 08 | 2001 | ADOPT IN-HOUSE MATERIAL GENERATION | $5,184 | $9,200 | Not Implemented |
SU0116 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $200 | $0 | Not Implemented |
SU0116 # 02 Y:2001 | 02 | 2001 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $18,236 | $114,000 | Not Implemented |
SU0116 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $7,323 | $979 | Implemented |
SU0116 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $5,330 | $16,000 | Not Implemented |
SU0116 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $418 | $100 | Implemented |
SU0116 # 06 Y:2001 | 06 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $329 | $0 | Not Implemented |
SU0116 # 07 Y:2001 | 07 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $503 | $0 | Implemented |
MA0481 # 01 Y:2001 | 01 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,820 | $30,000 | Implemented |
MA0481 # 02 Y:2001 | 02 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,390 | $5,500 | Implemented |
MA0481 # 03 Y:2001 | 03 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $6,380 | $4,800 | Not Implemented |
MA0481 # 04 Y:2001 | 04 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,370 | $7,000 | Implemented |
MA0481 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $910 | $1,315 | Implemented |
MA0481 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,400 | $10,000 | Not Implemented |
MA0481 # 07 Y:2001 | 07 | 2001 | INSULATE FEEDWATER TANK | $375 | $1,000 | Implemented |
MA0481 # 08 Y:2001 | 08 | 2001 | INSULATE FEEDWATER TANK | $260 | $1,300 | Not Implemented |
ME0300 # 01 Y:2000 | 01 | 2000 | REDUCE VENTILATION AIR | $42,906 | $66,000 | Not Implemented |
ME0300 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,547 | $13,428 | Not Implemented |
ME0300 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $765 | $850 | Not Implemented |
ME0300 # 04 Y:2000 | 04 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,323 | $3,625 | Not Implemented |
ME0300 # 05 Y:2000 | 05 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $5,600 | $9,000 | Implemented |
WI0374 # 01 Y:2000 | 01 | 2000 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $322,000 | $100,000 | Not Implemented |
WI0374 # 02 Y:2000 | 02 | 2000 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $42,500 | $75,000 | Not Implemented |