IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

349

matching recommendations
Reset
SIC 2851 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0596 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,740 $5,440 Implemented
MA0596 # 04 Y:2006 04 2006 USE UTILITY CONTROLLED POWER MANAGEMENT $9,148 $4,500 Implemented
MA0596 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,400 $37,895 Implemented
MA0596 # 06 Y:2006 06 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,195 $13,000 Implemented
MA0596 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $4,855 $8,000 Implemented
MA0596 # 09 Y:2006 09 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,026 $5,350 Implemented
MA0596 # 10 Y:2006 10 2006 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,415 $9,840 Implemented
AM0496 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $6,400 $8,050 Implemented
AM0496 # 03 Y:2005 03 2005 PAY UTILITY BILLS ON TIME $1,448 $0 Implemented
AM0496 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,400 $5 Implemented
AM0496 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $110 $0 Implemented
OK0709 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $3,684 $1,030 Implemented
MA0573 # 01 Y:2005 01 2005 INSTALL TIMERS AND/OR THERMOSTATS $15,507 $6,435 Implemented
MA0573 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $2,868 $3,920 Implemented
IC0091 # 01 Y:2004 01 2004 REPAIR OR REPLACE STEAM TRAPS $1,701 $638 Implemented
IC0091 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,038 $1,315 Implemented
IC0091 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,889 $1,265 Implemented
WV0304 # 11 Y:2004 11 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $418 $154 Implemented
WV0304 # 10 Y:2004 10 2004 INSULATE BARE EQUIPMENT $509 $44 Implemented
WV0304 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,376 $0 Implemented
WV0304 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,679 $22 Implemented
WV0304 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,051 $210 Implemented
WV0304 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $5,483 $4,491 Implemented
WV0304 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,964 $2,752 Implemented
IC0075 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,105 $2,900 Implemented