IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

745

matching recommendations
Reset
SIC 2851 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0374 # 10 Y:2000 10 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $514 $120 Implemented
WI0374 # 11 Y:2000 11 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $738 $0 Not Implemented
WI0374 # 12 Y:2000 12 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $426 $2,040 Implemented
SD0235 # 01 Y:1999 01 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $3,382 $7,776 Not Implemented
SD0235 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,361 $1,782 Not Implemented
SD0235 # 03 Y:1999 03 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,356 $0 Not Implemented
SD0235 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,218 $23,830 Implemented
SD0235 # 05 Y:1999 05 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,852 $0 Not Implemented
SD0235 # 06 Y:1999 06 1999 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,794 $14,000 Not Implemented
SD0235 # 07 Y:1999 07 1999 SCHEDULE DELIVERIES ACCORDING TO DEMAND $7,690 $0 Not Implemented
SD0235 # 08 Y:1999 08 1999 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $594 $0 Not Implemented
SD0235 # 09 Y:1999 09 1999 RECYCLE CLEANING SOLVENT AND REUSE $34,580 $20,000 Not Implemented
SD0235 # 10 Y:1999 10 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $107,143 $115,000 Not Implemented
SD0235 # 11 Y:1999 11 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,793 $0 Implemented
SD0235 # 12 Y:1999 12 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $4,290 $8,840 Not Implemented
SD0235 # 13 Y:1999 13 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $3,960 $0 Implemented
SD0235 # 14 Y:1999 14 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,362 $1,078 Implemented
OK0558 # 01 Y:1998 01 1998 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $43,625 $44,730 Not Implemented
OK0558 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,594 $0 Implemented
OK0558 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $4,561 $3,300 Not Implemented
OK0558 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $149,760 $280,000 Implemented
OK0558 # 05 Y:1998 05 1998 COVER INK CONTAINERS WHEN NOT IN USE $49,090 $5,700 Implemented
SD0173 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,603 $500 Implemented
SD0173 # 02 Y:1997 02 1997 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,017 $1,000 Implemented
SD0173 # 03 Y:1997 03 1997 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,910 $500 Implemented