IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 2851 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0709 # 12 Y:2005 12 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $696 $4,181 Not Implemented
OK0709 # 01 Y:2005 01 2005 USE POWER DURING OFF-PEAK PERIODS $2,560 $0 Not Implemented
OK0709 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $3,684 $1,030 Implemented
OK0709 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,659 $11,363 Not Implemented
OK0709 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,493 $21,700 Not Implemented
OK0709 # 05 Y:2005 05 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,000 $0 Not Implemented
OK0709 # 06 Y:2005 06 2005 INSTALL SET-BACK TIMERS $4,055 $2,205 Not Implemented
OK0709 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,077 $4,640 Not Implemented
OK0709 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $541 $3,034 Not Implemented
OK0709 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $824 $1,820 Not Implemented
OK0709 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $127 $109 Not Implemented
OK0709 # 11 Y:2005 11 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $159 $1,000 Not Implemented
OK0613 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,071 $4,000 Implemented
OK0613 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $304 $125 Not Implemented
OK0613 # 07 Y:2001 07 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,400 $572 Not Implemented
OK0613 # 06 Y:2001 06 2001 RECOVER AND REUSE WASTE MATERIAL $54,883 $20,680 Not Implemented
OK0613 # 05 Y:2001 05 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,508 $6,000 Not Implemented
OK0613 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $2,475 $7,120 Not Implemented
OK0613 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $456 $2,600 Implemented
OK0613 # 01 Y:2001 01 2001 INSTALL SET-BACK TIMERS $10,756 $1,026 Not Implemented
OK0558 # 05 Y:1998 05 1998 COVER INK CONTAINERS WHEN NOT IN USE $49,090 $5,700 Implemented
OK0558 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $149,760 $280,000 Implemented
OK0558 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $4,561 $3,300 Not Implemented
OK0558 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,594 $0 Implemented
OK0558 # 01 Y:1998 01 1998 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $43,625 $44,730 Not Implemented