Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
39
matching recommendationsSIC | 2851 | Paints And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0170 # 07 Y:2003 | 07 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $21,666 | $16,761 | Not Implemented |
SU0170 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,229 | $185 | Implemented |
SU0170 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $466 | $57 | Implemented |
SU0170 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,181 | $47 | Implemented |
SU0170 # 03 Y:2003 | 03 | 2003 | ADVERTISE PRODUCT OR SERVICE | $31,250 | $1,000 | Implemented |
SU0170 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,210 | $0 | Not Implemented |
SU0170 # 01 Y:2003 | 01 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,400 | $0 | Not Implemented |
SU0170 # 08 Y:2003 | 08 | 2003 | REPLACE BOILER | $10,809 | $33,514 | Not Implemented |
IC0069 # 02 Y:2003 | 02 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,983 | $8,812 | Implemented |
IC0069 # 08 Y:2003 | 08 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $31,618 | $251,040 | Not Implemented |
IC0069 # 07 Y:2003 | 07 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,246 | $26,552 | Not Implemented |
IC0069 # 06 Y:2003 | 06 | 2003 | REDESIGN PROCESS | $579 | $1,984 | Not Implemented |
IC0069 # 05 Y:2003 | 05 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $6,176 | $341 | Implemented |
IC0069 # 04 Y:2003 | 04 | 2003 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $10,894 | $10,560 | Implemented |
IC0069 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,894 | $5,280 | Implemented |
IC0069 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,411 | $2,200 | Implemented |
WV0276 # 11 Y:2003 | 11 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $744 | $320 | Implemented |
WV0276 # 01 Y:2003 | 01 | 2003 | INSTALL WASTE HEAT BOILER TO PRODUCE STEAM | $41,760 | $60,000 | Implemented |
WV0276 # 02 Y:2003 | 02 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $33,509 | $580 | Implemented |
WV0276 # 03 Y:2003 | 03 | 2003 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $30,964 | $9,195 | Not Implemented |
WV0276 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $8,969 | $500 | Not Implemented |
WV0276 # 05 Y:2003 | 05 | 2003 | USE OPTIMUM THICKNESS INSULATION | $8,395 | $2,640 | Implemented |
WV0276 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,737 | $16,926 | Implemented |
WV0276 # 07 Y:2003 | 07 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $2,328 | $480 | Implemented |
WV0276 # 08 Y:2003 | 08 | 2003 | INSTALL OCCUPANCY SENSORS | $2,514 | $2,200 | Implemented |