IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 286 Industrial Organic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0348 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,457 $2,420 Not Implemented
NC0348 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,998 $7,650 Not Implemented
NC0348 # 03 Y:2006 03 2006 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $315,779 $167,000 Not Implemented
NC0348 # 04 Y:2006 04 2006 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $23,395 $10,000 Not Implemented
NC0219 # 01 Y:2001 01 2001 ADOPT IN-HOUSE MATERIAL GENERATION $22,148 $70,000 Not Implemented
NC0219 # 04 Y:2001 04 2001 INCREASE AMOUNT OF CONDENSATE RETURNED $60,106 $92,100 n/a
NC0219 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $1,000 Not Implemented
NC0219 # 03 Y:2001 03 2001 REPAIR OR REPLACE STEAM TRAPS $35,343 $5,500 Not Implemented
NC0219 # 02 Y:2001 02 2001 ADJUST BURNERS FOR EFFICIENT OPERATION $33,380 $800 Implemented
NC0143 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $45,561 $55,000 Not Implemented
NC0143 # 05 Y:1998 05 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $15,191 $30,000 Not Implemented
NC0143 # 01 Y:1998 01 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,467 $700 Implemented
NC0143 # 04 Y:1998 04 1998 REDUCE FLUID FLOW RATES $2,040 $2,500 Not Implemented
NC0143 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $21,615 $25,600 Not Implemented
NC0143 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $50,294 $280,937 Not Implemented
OD0072 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $134 $200 Implemented
OD0072 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,474 $2,876 Not Implemented
OD0072 # 02 Y:1996 02 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $7,269 $4,887 Implemented
OD0072 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $252 $637 Not Implemented
NC0011 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,045 $300 Implemented
NC0011 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,033 $510 Implemented
NC0011 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $1,200 Implemented
NC0011 # 03 Y:1993 03 1993 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $7,188 $1,760 Implemented
NC0011 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,210 $21,960 Not Implemented
NC0011 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,817 $2,928 Not Implemented