IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

936

matching recommendations
Reset
SIC 286 Industrial Organic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0369 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,265 $7,389 Not Implemented
MI0369 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,267 $1,980 Implemented
MI0369 # 02 Y:2020 02 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $6,954 $7,492 Implemented
MI0369 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,259 $580 Implemented
UF0541 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $365,719 $1,800,000 Implemented
UF0541 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,871 $1,550 Implemented
UF0541 # 05 Y:2019 05 2019 INSTALL TURBULATORS $5,920 $7,500 Not Implemented
UF0541 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $40,964 $16,606 Implemented
UF0541 # 03 Y:2019 03 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,041 $3,368 Implemented
UF0541 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $11,463 $2,551 Implemented
NL0031 # 05 Y:2019 05 2019 REPAIR AND ELIMINATE STEAM LEAKS $5,225 $1,600 Not Implemented
NL0031 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,390 $24,394 Implemented
NL0031 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,344 $46,600 Implemented
NL0031 # 02 Y:2019 02 2019 INSTALL TURBULATORS $66,132 $93,000 Implemented
NL0031 # 01 Y:2019 01 2019 USE OPTIMUM TEMPERATURE $1,023,132 $178,000 Implemented
LS1807 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $78,734 $244,800 Not Implemented
LS1807 # 04 Y:2018 04 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $109 $170 Not Implemented
LS1807 # 03 Y:2018 03 2018 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $853 $840 Not Implemented
LS1807 # 02 Y:2018 02 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $70 $60 Not Implemented
LS1807 # 01 Y:2018 01 2018 PAY UTILITY BILLS ON TIME $3,305 $50 Not Implemented
UF0512 # 12 Y:2017 12 2017 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $280,764 $300,000 Implemented
UF0512 # 01 Y:2017 01 2017 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $401,159 $2,500,000 Not Implemented
UF0512 # 02 Y:2017 02 2017 ISOLATE HOT OR COLD EQUIPMENT $124,880 $17,000 Implemented
UF0512 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $38,189 $13,000 Implemented
UF0512 # 04 Y:2017 04 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,030 $40,000 Not Implemented