IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

943

matching recommendations
Reset
SIC 286 Industrial Organic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0105 # 05 Y:1994 05 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,906 $5,200 Not Implemented
UF0105 # 06 Y:1994 06 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,509 $22,500 Not Implemented
UF0105 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $102 $128 Not Implemented
UF0105 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $2,700 $2,700 Implemented
BD0015 # 01 Y:1994 01 1994 INSTALL OCCUPANCY SENSORS $1,977 $1,050 Implemented
BD0015 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,917 $1,240 Not Implemented
BD0015 # 03 Y:1994 03 1994 USE POWER DURING OFF-PEAK PERIODS $2,626 $20 Not Implemented
BD0015 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $430 $250 Implemented
BD0015 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,248 $20 Implemented
BD0015 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,008 $13,640 Implemented
BD0015 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $8,896 $4,930 Implemented
UF0102 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,168 $1,200 Not Implemented
UF0102 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $677 $2,791 Not Implemented
UF0102 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $252 $128 Not Implemented
UF0102 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $600 Not Implemented
UF0102 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,683 $9,153 Not Implemented
UF0102 # 06 Y:1994 06 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,343 $12,000 Not Implemented
UF0102 # 07 Y:1994 07 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,488 $53,050 Not Implemented
UF0102 # 08 Y:1994 08 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,270 $2,600 Not Implemented
UF0102 # 09 Y:1994 09 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,065 $42,800 Not Implemented
UL0109 # 01 Y:1994 01 1994 INSULATE BARE EQUIPMENT $1,770 $368 Not Implemented
UL0109 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,541 $68,870 Implemented
UL0109 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,055 $0 Not Implemented
UL0109 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,252 $0 Not Implemented
UL0109 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,348 $510 Not Implemented