Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
987
matching recommendationsSIC | 286 | Industrial Organic Chemicals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0512 # 05 Y:2017 | 05 | 2017 | USE CORRECT SIZE STEAM TRAPS | $27,893 | $340 | Implemented |
UF0512 # 06 Y:2017 | 06 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,845 | $2,750 | Implemented |
UF0512 # 07 Y:2017 | 07 | 2017 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $26,348 | $725 | Implemented |
UF0512 # 08 Y:2017 | 08 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,636 | $6,225 | Implemented |
UF0512 # 09 Y:2017 | 09 | 2017 | INCREASE AMOUNT OF CONDENSATE RETURNED | $4,891 | $0 | Implemented |
UF0512 # 10 Y:2017 | 10 | 2017 | INSTALL COMMON HEADER ON COMPRESSORS | $3,951 | $11,185 | Implemented |
UF0512 # 11 Y:2017 | 11 | 2017 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $2,136 | $1,562 | Not Implemented |
UF0512 # 12 Y:2017 | 12 | 2017 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $280,764 | $300,000 | Implemented |
LS0005 # 01 Y:2017 | 01 | 2017 | OPTIMIZE PLANT POWER FACTOR | $69,401 | $106,209 | Not Implemented |
LS0005 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,903 | $21,300 | Implemented |
LS0005 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,795 | $4,000 | Implemented |
LS0005 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,832 | $100 | Implemented |
LS0005 # 05 Y:2017 | 05 | 2017 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $134,326 | $621,739 | Not Implemented |
LS0005 # 06 Y:2017 | 06 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,044 | $34,056 | Not Implemented |
LS0005 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,997 | $3,280 | Implemented |
LS0005 # 08 Y:2017 | 08 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $330 | $400 | Implemented |
LS0005 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $347 | $585 | Implemented |
UD0966 # 01 Y:2017 | 01 | 2017 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $217,648 | $48,962 | Not Implemented |
UD0966 # 02 Y:2017 | 02 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $12,245 | $25,000 | Not Implemented |
UD0966 # 03 Y:2017 | 03 | 2017 | IMPROVE COMBUSTION CONTROL CAPABILITY | $270,579 | $100,000 | Not Implemented |
UD0966 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,225 | $4,000 | Not Implemented |
UD0966 # 05 Y:2017 | 05 | 2017 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $57,432 | $35,000 | Not Implemented |
UD0966 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,748 | $4,000 | Not Implemented |
UD0966 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $383,642 | $613,600 | Implemented |
UD0966 # 08 Y:2017 | 08 | 2017 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $229,882 | $595,039 | Not Implemented |