IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 2865 Cyclic Crudes And Intermediates
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0297 # 15 Y:2024 15 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,222 $0 Implemented
IC0297 # 12 Y:2024 12 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,395 $609 Implemented
IC0297 # 10 Y:2024 10 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,801 $0 Implemented
IC0297 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,754 $36,000 Implemented
IC0297 # 05 Y:2024 05 2024 USE OPTIMUM THICKNESS INSULATION $2,433 $1,693 Implemented
IC0297 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $26,122 $13,370 Implemented
IC0297 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $2,641 $1,066 Implemented
IC0297 # 02 Y:2024 02 2024 INSULATE BARE EQUIPMENT $5,801 $2,620 Implemented
IC0297 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,288 $1,336 Implemented
IC0297 # 13 Y:2024 13 2024 REPAIR AND ELIMINATE STEAM LEAKS $4,854 $360 Implemented
IC0297 # 14 Y:2024 14 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $119 $0 Implemented
AM0628 # 06 Y:2013 06 2013 INSTALL SKYLIGHTS $1,525 $0 Implemented
AM0628 # 07 Y:2013 07 2013 INSULATE FEEDWATER TANK $820 $455 Implemented
AM0628 # 08 Y:2013 08 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $520 $0 Implemented
AM0628 # 04 Y:2013 04 2013 INSTALL SKYLIGHTS $3,300 $5,300 Implemented
AM0628 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,960 $20 Implemented
AM0628 # 01 Y:2013 01 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,700 $675 Implemented
WV0450 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $130,899 $157,320 Implemented
WV0450 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $173,557 $1,000 Implemented
WV0450 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,953 $18,267 Implemented
WV0450 # 07 Y:2012 07 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $11,389 $6,500 Implemented
WV0450 # 11 Y:2012 11 2012 DEVELOP A REPAIR/REPLACE POLICY $8,489 $1,210 Implemented
DL0076 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $63,000 $100 Implemented
DL0076 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,500 $4,000 Implemented
UM0306 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,571 $9,421 Implemented