Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
780
matching recommendationsSIC | 2869 | Industrial Organic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0226 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,760 | $500 | Implemented |
UM0254 # 01 Y:2004 | 01 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $31,255 | $30,000 | Not Implemented |
UM0254 # 02 Y:2004 | 02 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,650 | $2,200 | Implemented |
UM0254 # 03 Y:2004 | 03 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,907 | $0 | Implemented |
UM0254 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,584 | $15,000 | Not Implemented |
UM0254 # 05 Y:2004 | 05 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,267 | $10,000 | Not Implemented |
UM0254 # 06 Y:2004 | 06 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,010 | $1,080 | Implemented |
UM0254 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,479 | $1,038 | Implemented |
WI0459 # 01 Y:2004 | 01 | 2004 | USE OPTIMUM TEMPERATURE | $17,598 | $4,500 | Not Implemented |
WI0459 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,519 | $26,871 | n/a |
WI0459 # 03 Y:2004 | 03 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $11,712 | $11,250 | n/a |
WI0459 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $340 | $640 | Implemented |
WI0459 # 05 Y:2004 | 05 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $323 | $1,206 | Not Implemented |
IC0060 # 01 Y:2003 | 01 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $148,006 | $13,000 | Implemented |
IC0060 # 02 Y:2003 | 02 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,832 | $13,240 | Implemented |
IC0060 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,390 | $20,640 | Implemented |
IC0060 # 04 Y:2003 | 04 | 2003 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $163,590 | $170,491 | Implemented |
IC0060 # 05 Y:2003 | 05 | 2003 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $92,294 | $190,000 | Not Implemented |
IC0060 # 06 Y:2003 | 06 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,196 | $22,867 | Not Implemented |
IC0060 # 07 Y:2003 | 07 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $11,372 | $5,850 | Implemented |
IC0060 # 08 Y:2003 | 08 | 2003 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,439 | $6,850 | Not Implemented |
IC0060 # 09 Y:2003 | 09 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,626 | $13,998 | Implemented |
IC0060 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,705 | $11,354 | Implemented |
LL0154 # 01 Y:2003 | 01 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $18,488,939 | $413,700 | n/a |
LL0154 # 02 Y:2003 | 02 | 2003 | INCREASE AMOUNT OF CONDENSATE RETURNED | $11,340,034 | $773,535 | n/a |