Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
765
matching recommendationsSIC | 2869 | Industrial Organic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0548 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $2,573 | $5,317 | Implemented |
SD0548 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,113 | $1,500 | Implemented |
SD0548 # 08 Y:2017 | 08 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,052 | $360 | Implemented |
AM0711 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $62,500 | $108,300 | Not Implemented |
AM0711 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,350 | $57,195 | Implemented |
AM0711 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,630 | $9,030 | Implemented |
AM0711 # 04 Y:2016 | 04 | 2016 | OPTIMIZE PLANT POWER FACTOR | $18,515 | $60,200 | Not Implemented |
AM0711 # 05 Y:2016 | 05 | 2016 | REPAIR AND ELIMINATE STEAM LEAKS | $17,450 | $26 | Not Implemented |
AM0711 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,000 | $13 | Not Implemented |
AM0711 # 07 Y:2016 | 07 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,344 | $2,620 | Not Implemented |
AM0711 # 08 Y:2016 | 08 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,880 | $0 | Implemented |
AM0711 # 09 Y:2016 | 09 | 2016 | USE SYNTHETIC LUBRICANT | $1,072 | $0 | Not Implemented |
AM0711 # 10 Y:2016 | 10 | 2016 | PAY BILLS ON TIME TO AVOID LATE FEES | $471 | $0 | Not Implemented |
NC0569 # 01 Y:2016 | 01 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $68,453 | $280,000 | Not Implemented |
NC0569 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,493 | $48,500 | Not Implemented |
NC0569 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,986 | $18,150 | Implemented |
NC0569 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,698 | $200 | Implemented |
NC0569 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,208 | $33,756 | Implemented |
NC0569 # 06 Y:2016 | 06 | 2016 | USE PHOTOCELL CONTROLS | $423 | $150 | Implemented |
NC0569 # 07 Y:2016 | 07 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $2,230 | $4,256 | Implemented |
NC0569 # 08 Y:2016 | 08 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,856 | $230 | Not Implemented |
IP0062 # 01 Y:2016 | 01 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $13,450 | $7 | Implemented |
IP0062 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $967 | $22 | Implemented |
IP0062 # 03 Y:2016 | 03 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $605 | $0 | Not Implemented |
IP0062 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $19,981 | $2,354 | Not Implemented |