Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
79
matching recommendationsSIC | 2869 | Industrial Organic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0441 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $671 | $1,203 | n/a |
MI0441 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,124 | $1,980 | n/a |
MI0441 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO HEAT WATER | $2,247 | $2,602 | n/a |
MI0441 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,377 | $510 | n/a |
MI0441 # 03 Y:2024 | 03 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,427 | $1,306 | n/a |
MI0441 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $24,362 | $840 | n/a |
MI0441 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $58,244 | $186,000 | n/a |
MI0369 # 06 Y:2020 | 06 | 2020 | PAY BILLS ON TIME TO AVOID LATE FEES | $438 | $0 | Not Implemented |
MI0369 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,259 | $580 | Implemented |
MI0369 # 02 Y:2020 | 02 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $6,954 | $7,492 | Implemented |
MI0369 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,267 | $1,980 | Implemented |
MI0369 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,265 | $7,389 | Not Implemented |
MI0369 # 05 Y:2020 | 05 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $551 | $280 | Not Implemented |
UF0541 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $11,463 | $2,551 | Implemented |
UF0541 # 05 Y:2019 | 05 | 2019 | INSTALL TURBULATORS | $5,920 | $7,500 | Not Implemented |
UF0541 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $40,964 | $16,606 | Implemented |
UF0541 # 03 Y:2019 | 03 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $22,041 | $3,368 | Implemented |
UF0541 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $365,719 | $1,800,000 | Implemented |
UF0541 # 06 Y:2019 | 06 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,871 | $1,550 | Implemented |
UF0512 # 03 Y:2017 | 03 | 2017 | OPTIMIZE PLANT POWER FACTOR | $38,189 | $13,000 | Implemented |
UF0512 # 02 Y:2017 | 02 | 2017 | ISOLATE HOT OR COLD EQUIPMENT | $124,880 | $17,000 | Implemented |
UF0512 # 07 Y:2017 | 07 | 2017 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $26,348 | $725 | Implemented |
UF0512 # 01 Y:2017 | 01 | 2017 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $401,159 | $2,500,000 | Not Implemented |
UF0512 # 11 Y:2017 | 11 | 2017 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $2,136 | $1,562 | Not Implemented |
UF0512 # 10 Y:2017 | 10 | 2017 | INSTALL COMMON HEADER ON COMPRESSORS | $3,951 | $11,185 | Implemented |