Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
68
matching recommendationsSIC | 2869 | Industrial Organic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1032 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,757 | $0 | Not Implemented |
UD1032 # 08 Y:2022 | 08 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $351,582 | $1,000,000 | Not Implemented |
UD1032 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $68,929 | $100,000 | Implemented |
UD1032 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,104 | $0 | Implemented |
UD1032 # 01 Y:2022 | 01 | 2022 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $58,668 | $25,875 | Not Implemented |
UD1032 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,018 | $10,000 | Not Implemented |
UD1032 # 07 Y:2022 | 07 | 2022 | INSTALL OCCUPANCY SENSORS | $19,725 | $23,544 | Not Implemented |
UD1032 # 05 Y:2022 | 05 | 2022 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $14,725 | $4,661 | Not Implemented |
UD0966 # 03 Y:2017 | 03 | 2017 | IMPROVE COMBUSTION CONTROL CAPABILITY | $270,579 | $100,000 | Not Implemented |
UD0966 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,748 | $4,000 | Not Implemented |
UD0966 # 02 Y:2017 | 02 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $12,245 | $25,000 | Not Implemented |
UD0966 # 01 Y:2017 | 01 | 2017 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $217,648 | $48,962 | Not Implemented |
UD0966 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $383,642 | $613,600 | Implemented |
UD0966 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,225 | $4,000 | Not Implemented |
UD0966 # 09 Y:2017 | 09 | 2017 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $76,595 | $198,657 | Not Implemented |
UD0966 # 08 Y:2017 | 08 | 2017 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $229,882 | $595,039 | Not Implemented |
UD0966 # 05 Y:2017 | 05 | 2017 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $57,432 | $35,000 | Not Implemented |
UD0750 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $273,386 | $100,000 | Not Implemented |
UD0750 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $226,890 | $120,000 | Implemented |
UD0750 # 03 Y:2006 | 03 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $155,000 | $187,200 | Implemented |
UD0750 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $79,000 | $45,000 | Implemented |
UD0750 # 05 Y:2006 | 05 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $56,000 | $0 | Not Implemented |
UD0750 # 06 Y:2006 | 06 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $44,000 | $25,000 | Implemented |
UD0750 # 07 Y:2006 | 07 | 2006 | USE OPTIMUM THICKNESS INSULATION | $41,225 | $39,892 | Not Implemented |
UD0750 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,020 | $135,999 | Not Implemented |