Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 2869 | Industrial Organic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0143 # 02 Y:2015 | 02 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,928 | $0 | Implemented |
DL0143 # 03 Y:2015 | 03 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,030 | $1,000 | Not Implemented |
DL0143 # 04 Y:2015 | 04 | 2015 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $1,988 | $0 | Not Implemented |
DL0143 # 05 Y:2015 | 05 | 2015 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,468 | $200 | Not Implemented |
DL0143 # 06 Y:2015 | 06 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $1,582 | $3,000 | Implemented |
DL0143 # 07 Y:2015 | 07 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $855 | $0 | Implemented |
DL0143 # 01 Y:2015 | 01 | 2015 | REDUCE VENTILATION AIR | $12,970 | $0 | Implemented |
WV0382 # 01 Y:2008 | 01 | 2008 | REPAIR OR REPLACE STEAM TRAPS | $165,919 | $5,500 | Implemented |
WV0382 # 15 Y:2008 | 15 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $766 | $3,539 | Implemented |
WV0382 # 02 Y:2008 | 02 | 2008 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $109,212 | $38,900 | Implemented |
WV0382 # 03 Y:2008 | 03 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,966 | $8,615 | Not Implemented |
WV0382 # 04 Y:2008 | 04 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,388 | $8,615 | Not Implemented |
WV0382 # 05 Y:2008 | 05 | 2008 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $11,112 | $100,800 | Not Implemented |
WV0382 # 06 Y:2008 | 06 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $9,768 | $3,213 | Implemented |
WV0382 # 07 Y:2008 | 07 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,784 | $224 | Not Implemented |
WV0382 # 08 Y:2008 | 08 | 2008 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $4,689 | $996 | Implemented |
WV0382 # 09 Y:2008 | 09 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,240 | $1,000 | Not Implemented |
WV0382 # 10 Y:2008 | 10 | 2008 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,383 | $4,160 | Not Implemented |
WV0382 # 11 Y:2008 | 11 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,016 | $195 | Implemented |
WV0382 # 12 Y:2008 | 12 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,884 | $3,093 | Not Implemented |
WV0382 # 13 Y:2008 | 13 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,076 | $31 | Implemented |
WV0382 # 14 Y:2008 | 14 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $902 | $0 | Implemented |
LE0247 # 01 Y:2006 | 01 | 2006 | REPLACE BOILER | $115,080 | $223,000 | Not Implemented |
LE0247 # 02 Y:2006 | 02 | 2006 | REVISE RAW MATERIAL SPECS | $106,250 | $60,000 | Not Implemented |
LE0247 # 03 Y:2006 | 03 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $26,312 | $16,000 | Not Implemented |