Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsSIC | 2869 | Industrial Organic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0512 # 12 Y:2017 | 12 | 2017 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $280,764 | $300,000 | Implemented |
UF0512 # 11 Y:2017 | 11 | 2017 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $2,136 | $1,562 | Not Implemented |
UF0512 # 10 Y:2017 | 10 | 2017 | INSTALL COMMON HEADER ON COMPRESSORS | $3,951 | $11,185 | Implemented |
UF0512 # 09 Y:2017 | 09 | 2017 | INCREASE AMOUNT OF CONDENSATE RETURNED | $4,891 | $0 | Implemented |
UF0512 # 08 Y:2017 | 08 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,636 | $6,225 | Implemented |
UF0512 # 07 Y:2017 | 07 | 2017 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $26,348 | $725 | Implemented |
UF0512 # 06 Y:2017 | 06 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,845 | $2,750 | Implemented |
UF0512 # 05 Y:2017 | 05 | 2017 | USE CORRECT SIZE STEAM TRAPS | $27,893 | $340 | Implemented |
UF0512 # 04 Y:2017 | 04 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $23,030 | $40,000 | Not Implemented |
UF0512 # 03 Y:2017 | 03 | 2017 | OPTIMIZE PLANT POWER FACTOR | $38,189 | $13,000 | Implemented |
UF0512 # 02 Y:2017 | 02 | 2017 | ISOLATE HOT OR COLD EQUIPMENT | $124,880 | $17,000 | Implemented |
UF0512 # 01 Y:2017 | 01 | 2017 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $401,159 | $2,500,000 | Not Implemented |
LS0005 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,903 | $21,300 | Implemented |
LS0005 # 01 Y:2017 | 01 | 2017 | OPTIMIZE PLANT POWER FACTOR | $69,401 | $106,209 | Not Implemented |
LS0005 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,795 | $4,000 | Implemented |
LS0005 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,832 | $100 | Implemented |
LS0005 # 05 Y:2017 | 05 | 2017 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $134,326 | $621,739 | Not Implemented |
LS0005 # 06 Y:2017 | 06 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,044 | $34,056 | Not Implemented |
LS0005 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,997 | $3,280 | Implemented |
LS0005 # 08 Y:2017 | 08 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $330 | $400 | Implemented |
LS0005 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $347 | $585 | Implemented |
UD0966 # 09 Y:2017 | 09 | 2017 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $76,595 | $198,657 | Not Implemented |
UD0966 # 08 Y:2017 | 08 | 2017 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $229,882 | $595,039 | Not Implemented |
UD0966 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $383,642 | $613,600 | Implemented |
UD0966 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,748 | $4,000 | Not Implemented |