IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 2873 Nitrogenous Fertilizers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0618 # 07 Y:2024 07 2024 IMPROVE SPACE COMFORT CONDITIONING $10,000 $1,931 n/a
UF0618 # 06 Y:2024 06 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,621 $12,380 n/a
UF0618 # 05 Y:2024 05 2024 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $150,000 $70,000 n/a
UF0618 # 04 Y:2024 04 2024 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $308,175 $14,388 n/a
UF0618 # 03 Y:2024 03 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,409 $5,855 n/a
UF0618 # 02 Y:2024 02 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $1,789 $872 n/a
UF0618 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $19,157 $112,913 n/a
NL0072 # 01 Y:2022 01 2022 REPLACE BOILER $18,966 $23,925 Implemented
NL0072 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $773 $1,445 Not Implemented
NL0072 # 03 Y:2022 03 2022 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $2,055 $266 Implemented
NL0072 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,761 $20,400 Implemented
MZ0119 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,154 $14,260 Implemented
MZ0119 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $1,150 $900 Implemented
MZ0119 # 04 Y:2013 04 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,728 $0 Not Implemented
MZ0119 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,963 $0 Implemented
AS0376 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,286 $2,016 Not Implemented
AS0376 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,889 $1,550 Not Implemented
AS0376 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,069 $60 Not Implemented
GT0606 # 08 Y:1996 08 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,074 $10,500 Implemented
GT0606 # 07 Y:1996 07 1996 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,067 $350 Not Implemented
GT0606 # 06 Y:1996 06 1996 COVER OPEN TANKS $7,420 $10,000 Implemented
GT0606 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,090 $0 Not Implemented
GT0606 # 02 Y:1996 02 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $88,813 $83,600 Not Implemented
GT0606 # 03 Y:1996 03 1996 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $9,060 $1,000 Implemented
GT0606 # 04 Y:1996 04 1996 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $32,500 $40,000 Not Implemented