Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 2873 | Nitrogenous Fertilizers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0618 # 07 Y:2024 | 07 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $10,000 | $1,931 | n/a |
UF0618 # 06 Y:2024 | 06 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,621 | $12,380 | n/a |
UF0618 # 05 Y:2024 | 05 | 2024 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $150,000 | $70,000 | n/a |
UF0618 # 04 Y:2024 | 04 | 2024 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $308,175 | $14,388 | n/a |
UF0618 # 03 Y:2024 | 03 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,409 | $5,855 | n/a |
UF0618 # 02 Y:2024 | 02 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $1,789 | $872 | n/a |
UF0618 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $19,157 | $112,913 | n/a |
NL0072 # 01 Y:2022 | 01 | 2022 | REPLACE BOILER | $18,966 | $23,925 | Implemented |
NL0072 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $773 | $1,445 | Not Implemented |
NL0072 # 03 Y:2022 | 03 | 2022 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $2,055 | $266 | Implemented |
NL0072 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,761 | $20,400 | Implemented |
MZ0119 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,154 | $14,260 | Implemented |
MZ0119 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $1,150 | $900 | Implemented |
MZ0119 # 04 Y:2013 | 04 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,728 | $0 | Not Implemented |
MZ0119 # 01 Y:2013 | 01 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,963 | $0 | Implemented |
AS0376 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,286 | $2,016 | Not Implemented |
AS0376 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,889 | $1,550 | Not Implemented |
AS0376 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,069 | $60 | Not Implemented |
GT0606 # 08 Y:1996 | 08 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,074 | $10,500 | Implemented |
GT0606 # 07 Y:1996 | 07 | 1996 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,067 | $350 | Not Implemented |
GT0606 # 06 Y:1996 | 06 | 1996 | COVER OPEN TANKS | $7,420 | $10,000 | Implemented |
GT0606 # 01 Y:1996 | 01 | 1996 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,090 | $0 | Not Implemented |
GT0606 # 02 Y:1996 | 02 | 1996 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $88,813 | $83,600 | Not Implemented |
GT0606 # 03 Y:1996 | 03 | 1996 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $9,060 | $1,000 | Implemented |
GT0606 # 04 Y:1996 | 04 | 1996 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $32,500 | $40,000 | Not Implemented |