Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsSIC | 289 | Miscellaneous Chemical Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0727 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $14,689 | $7,635 | Implemented |
OK0727 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $1,646 | $75 | Implemented |
OK0727 # 01 Y:2006 | 01 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,431 | $2,462 | Implemented |
OK0710 # 02 Y:2005 | 02 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,475 | $3,550 | Implemented |
OK0710 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,439 | $4,746 | Implemented |
OK0619 # 13 Y:2001 | 13 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $877 | $0 | Implemented |
OK0619 # 11 Y:2001 | 11 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,523 | $10,275 | Implemented |
OK0619 # 10 Y:2001 | 10 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,577 | $3,000 | Implemented |
OK0619 # 08 Y:2001 | 08 | 2001 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,200 | $1,326 | Implemented |
OK0619 # 07 Y:2001 | 07 | 2001 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $68,500 | $15,000 | Implemented |
OK0619 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $792 | $310 | Implemented |
OK0619 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,184 | $200 | Implemented |
OK0161 # 02 Y:1985 | 02 | 1985 | OPTIMIZE PLANT POWER FACTOR | $2,436 | $5,915 | Implemented |
OK0161 # 05 Y:1985 | 05 | 1985 | USE RADIANT HEATER FOR SPOT HEATING | $11,300 | $3,959 | Implemented |
OK0161 # 04 Y:1985 | 04 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,080 | $100 | Implemented |
OK0161 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $240 | $95 | Implemented |
OK0161 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,880 | $874 | Implemented |
OK0040 # 04 Y:1982 | 04 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $360 | $15 | Implemented |
OK0040 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,994 | $922 | Implemented |
OK0040 # 02 Y:1982 | 02 | 1982 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $1,682 | $4,000 | Implemented |
OK0040 # 01 Y:1982 | 01 | 1982 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,020 | $2,680 | Implemented |