IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0970 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $164 $50 Not Implemented
WV0521 # 01 Y:2016 01 2016 USE DEMAND CONTROLLER OR LOAD SHEDDER $26,401 $25,760 Not Implemented
WV0521 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $10,186 $8,000 Implemented
WV0521 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,543 $2,714 Not Implemented
WV0521 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,142 $152 Implemented
WV0521 # 05 Y:2016 05 2016 DEVELOP A REPAIR/REPLACE POLICY $2,423 $1,224 Not Implemented
WV0521 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $1,612 $3,592 Not Implemented
WV0521 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $728 $443 Implemented
WV0521 # 08 Y:2016 08 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $718 $500 Implemented
WV0521 # 09 Y:2016 09 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $408 $728 Not Implemented
UD0906 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,248 $0 Not Implemented
UD0906 # 02 Y:2014 02 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,093 $0 Implemented
UD0906 # 03 Y:2014 03 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,503 $0 Implemented
UD0906 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $2,954 $1,575 Implemented
UD0906 # 05 Y:2014 05 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,162 $10,000 Not Implemented
UD0906 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,456 $5,614 Implemented
UD0906 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,271 $1,000 Implemented
UD0906 # 08 Y:2014 08 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $618 $0 Not Implemented
UD0906 # 09 Y:2014 09 2014 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $58,357 $14,000 Not Implemented
UD0887 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,553 $50 Implemented
UD0887 # 02 Y:2013 02 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,438 $0 Implemented
UD0887 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $497 $500 Implemented
UD0887 # 04 Y:2013 04 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $8,763 $2,075 Implemented
UD0887 # 05 Y:2013 05 2013 ADD AREA LIGHTING SWITCHES $3,141 $350 Not Implemented
UD0887 # 06 Y:2013 06 2013 ADD AREA LIGHTING SWITCHES $594 $350 Implemented