Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
77
matching recommendationsSIC | 289 | Miscellaneous Chemical Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1062 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,907 | $0 | Not Implemented |
UD1062 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,486 | $0 | Not Implemented |
UD1062 # 03 Y:2023 | 03 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $705 | $260 | Not Implemented |
UD1062 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $727 | $952 | Not Implemented |
UD1062 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $1,152 | $2,000 | Implemented |
UD1056 # 12 Y:2023 | 12 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,983 | $148,109 | Not Implemented |
UD1056 # 05 Y:2023 | 05 | 2023 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $17,114 | $3,100 | Implemented |
UD1056 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,442 | $0 | Implemented |
UD1056 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,193 | $0 | Implemented |
UD1056 # 06 Y:2023 | 06 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,784 | $0 | Implemented |
UD1056 # 07 Y:2023 | 07 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $7,938 | $800 | Implemented |
UD1056 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,824 | $0 | Implemented |
UD1056 # 09 Y:2023 | 09 | 2023 | INSTALL OCCUPANCY SENSORS | $7,204 | $1,800 | Implemented |
UD1056 # 10 Y:2023 | 10 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,229 | $0 | Not Implemented |
UD1056 # 11 Y:2023 | 11 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $228 | $368 | Implemented |
UD1056 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,573 | $0 | Implemented |
UD1056 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,474 | $250 | Implemented |
LE0544 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,000 | $120,000 | Not Implemented |
LE0544 # 06 Y:2023 | 06 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $986 | $2,000 | Not Implemented |
LE0544 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,260 | $9,128 | Not Implemented |
LE0544 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,184 | $4,100 | Implemented |
LE0544 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,870 | $2,400 | Not Implemented |
LE0544 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,153 | $11,000 | Not Implemented |
LE0544 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,946 | $100 | Not Implemented |
LT8366 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $18,863 | $61,076 | n/a |