IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0226 # 08 Y:2001 08 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,717 $2,500 Implemented
SF0226 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,944 $14,649 n/a
SF0226 # 10 Y:2001 10 2001 INSTALL OCCUPANCY SENSORS $1,758 $2,040 Implemented
SF0226 # 11 Y:2001 11 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $863 $1,126 Implemented
SF0226 # 12 Y:2001 12 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,217 $8,000 Not Implemented
SF0226 # 13 Y:2001 13 2001 INSTALL OCCUPANCY SENSORS $8,563 $24,267 Not Implemented
SF0226 # 14 Y:2001 14 2001 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM $9,549 $15,524 Not Implemented
SF0220 # 01 Y:2001 01 2001 REDUCE FLUID FLOW RATES $51,887 $240 Implemented
SF0220 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $924 $0 Not Implemented
SF0220 # 03 Y:2001 03 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $9,165 $2,491 Not Implemented
SF0220 # 04 Y:2001 04 2001 UPGRADE CONTROLS ON COMPRESSORS $305 $257 Implemented
SF0220 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,154 $3,275 Not Implemented
SF0220 # 06 Y:2001 06 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $15,604 $30,000 Not Implemented
SF0220 # 07 Y:2001 07 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,670 $4,200 Not Implemented
NV0074 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $385 $225 Implemented
NV0074 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $864 $200 Implemented
NV0074 # 03 Y:1996 03 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $2,822 $0 Not Implemented
NV0074 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,545 $200 Implemented
NV0074 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $387 $200 Implemented
NV0074 # 06 Y:1996 06 1996 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $12,900 $3,600 Not Implemented
NV0074 # 07 Y:1996 07 1996 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $4,531 $7,000 Not Implemented
SF0063 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $778 $1,618 Implemented
SF0063 # 02 Y:1995 02 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,296 $10,135 Implemented
SF0063 # 03 Y:1995 03 1995 USE PHOTOCELL CONTROLS $907 $348 Not Implemented
SF0063 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,331 $1,426 Implemented