IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0727 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $14,689 $7,635 Implemented
OK0727 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,646 $75 Implemented
OK0727 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,431 $2,462 Implemented
OK0710 # 02 Y:2005 02 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,475 $3,550 Implemented
OK0710 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,439 $4,746 Implemented
OK0619 # 13 Y:2001 13 2001 $877 $0 Implemented
OK0619 # 11 Y:2001 11 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,523 $10,275 Implemented
OK0619 # 10 Y:2001 10 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,577 $3,000 Implemented
OK0619 # 08 Y:2001 08 2001 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,200 $1,326 Implemented
OK0619 # 07 Y:2001 07 2001 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $68,500 $15,000 Implemented
OK0619 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $792 $310 Implemented
OK0619 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,184 $200 Implemented
OK0161 # 02 Y:1985 02 1985 OPTIMIZE PLANT POWER FACTOR $2,436 $5,915 Implemented
OK0161 # 05 Y:1985 05 1985 USE RADIANT HEATER FOR SPOT HEATING $11,300 $3,959 Implemented
OK0161 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,080 $100 Implemented
OK0161 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $95 Implemented
OK0161 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,880 $874 Implemented
OK0040 # 04 Y:1982 04 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $360 $15 Implemented
OK0040 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,994 $922 Implemented
OK0040 # 02 Y:1982 02 1982 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $1,682 $4,000 Implemented
OK0040 # 01 Y:1982 01 1982 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,020 $2,680 Implemented