IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0255 # 01 Y:2025 01 2025 INSTALL OCCUPANCY SENSORS $3,259 $5,600 n/a
DL0255 # 02 Y:2025 02 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,638 $17,000 n/a
DL0255 # 03 Y:2025 03 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $246,492 $36,000 n/a
DL0255 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,077 $15,000 n/a
DL0255 # 05 Y:2025 05 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,190 $5,500 n/a
DL0255 # 06 Y:2025 06 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,300 $800 n/a
DL0255 # 07 Y:2025 07 2025 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,100 $25,000 n/a
DL0255 # 08 Y:2025 08 2025 IMPROVE COMBUSTION CONTROL CAPABILITY $76,162 $42,000 n/a
DL0255 # 09 Y:2025 09 2025 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $9,008 $0 n/a
DL0255 # 10 Y:2025 10 2025 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $397 $55,182 n/a
LE0544 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,153 $11,000 Not Implemented
LE0544 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,946 $100 Not Implemented
LE0544 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,260 $9,128 Not Implemented
LE0544 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $25,000 $120,000 Not Implemented
LE0544 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $2,400 Not Implemented
LE0544 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $986 $2,000 Not Implemented
LE0544 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,184 $4,100 Implemented
LE0470 # 06 Y:2019 06 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $268,493 $1,534,575 Not Implemented
LE0470 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,769 $115,000 Not Implemented
LE0470 # 04 Y:2019 04 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,332 $25,000 Not Implemented
LE0470 # 03 Y:2019 03 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $25,833 $35,000 Not Implemented
LE0470 # 02 Y:2019 02 2019 USE AUTOMATIC FLOW CONTROL $20,000 $6,500 Not Implemented
LE0470 # 01 Y:2019 01 2019 PAY UTILITY BILLS ON TIME $4,000 $0 Not Implemented
LE0463 # 03 Y:2018 03 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,825 $7,525 Not Implemented
LE0463 # 07 Y:2018 07 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,624 $93,750 Implemented