Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
300
matching recommendationsSIC | 2891 | Adhesives And Sealants |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0762 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,257 | $19,975 | Implemented |
MA0762 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $65,741 | $161,899 | Implemented |
WM0084 # 12 Y:2016 | 12 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $866 | $1,988 | Implemented |
WM0084 # 11 Y:2016 | 11 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,465 | $0 | Implemented |
WM0084 # 08 Y:2016 | 08 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,103 | $400 | Implemented |
WM0084 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,665 | $0 | Implemented |
WM0084 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,605 | $1,900 | Implemented |
WM0084 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,124 | $83,912 | Implemented |
WV0521 # 08 Y:2016 | 08 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $718 | $500 | Implemented |
WV0521 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $728 | $443 | Implemented |
WV0521 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,142 | $152 | Implemented |
WV0521 # 02 Y:2016 | 02 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $10,186 | $8,000 | Implemented |
LE0409 # 02 Y:2016 | 02 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,416 | $2,000 | Implemented |
LE0409 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,598 | $5,700 | Implemented |
LE0409 # 05 Y:2016 | 05 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $6,148 | $21,000 | Implemented |
LE0409 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $591 | $0 | Implemented |
SF0475 # 03 Y:2015 | 03 | 2015 | INSULATE BARE EQUIPMENT | $2,990 | $822 | Implemented |
SF0475 # 08 Y:2015 | 08 | 2015 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,696 | $401,249 | Implemented |
SF0475 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $1,345 | $5,518 | Implemented |
SF0475 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,265 | $9,844 | Implemented |
SF0475 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $496 | $1,340 | Implemented |
SF0475 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,033 | $0 | Implemented |
SF0475 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,039 | $0 | Implemented |
SF0475 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $703 | $2,001 | Implemented |
UD0906 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $2,954 | $1,575 | Implemented |