IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

300

matching recommendations
Reset
SIC 2891 Adhesives And Sealants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0762 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,257 $19,975 Implemented
MA0762 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,741 $161,899 Implemented
WM0084 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $866 $1,988 Implemented
WM0084 # 11 Y:2016 11 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,465 $0 Implemented
WM0084 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,103 $400 Implemented
WM0084 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,665 $0 Implemented
WM0084 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,605 $1,900 Implemented
WM0084 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,124 $83,912 Implemented
WV0521 # 08 Y:2016 08 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $718 $500 Implemented
WV0521 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $728 $443 Implemented
WV0521 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,142 $152 Implemented
WV0521 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $10,186 $8,000 Implemented
LE0409 # 02 Y:2016 02 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,416 $2,000 Implemented
LE0409 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,598 $5,700 Implemented
LE0409 # 05 Y:2016 05 2016 USE RADIANT HEATER FOR SPOT HEATING $6,148 $21,000 Implemented
LE0409 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $591 $0 Implemented
SF0475 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $2,990 $822 Implemented
SF0475 # 08 Y:2015 08 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $57,696 $401,249 Implemented
SF0475 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,345 $5,518 Implemented
SF0475 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,265 $9,844 Implemented
SF0475 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $496 $1,340 Implemented
SF0475 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,033 $0 Implemented
SF0475 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,039 $0 Implemented
SF0475 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $703 $2,001 Implemented
UD0906 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $2,954 $1,575 Implemented