IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

598

matching recommendations
Reset
SIC 2891 Adhesives And Sealants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0416 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,926 $4,530 Not Implemented
WV0416 # 07 Y:2010 07 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,558 $1,000 Implemented
WV0416 # 08 Y:2010 08 2010 DEVELOP A REPAIR/REPLACE POLICY $3,797 $830 Implemented
WV0416 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,776 $1,360 Implemented
WV0416 # 10 Y:2010 10 2010 IMPROVE LUBRICATION PRACTICES $1,031 $938 Not Implemented
WV0416 # 11 Y:2010 11 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $688 $280 Not Implemented
UM0344 # 01 Y:2008 01 2008 $33,410 $1,760 Not Implemented
UM0344 # 02 Y:2008 02 2008 $17,820 $22,500 Not Implemented
UM0344 # 03 Y:2008 03 2008 $10,954 $4,045 Not Implemented
UM0344 # 04 Y:2008 04 2008 $8,182 $7,500 Implemented
UM0344 # 05 Y:2008 05 2008 $6,086 $7,620 Not Implemented
UM0344 # 06 Y:2008 06 2008 $3,666 $828 Not Implemented
UM0344 # 07 Y:2008 07 2008 $3,655 $455 Not Implemented
MI0124 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,063 $40,180 n/a
MI0124 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,719 $2,400 n/a
MI0124 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $28 n/a
MI0124 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $950 $1,018 n/a
MI0124 # 05 Y:2006 05 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $32,268 $31,176 n/a
WV0327 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $11,686 $2,140 Implemented
WV0327 # 02 Y:2005 02 2005 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $9,890 $3,960 Not Implemented
WV0327 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,323 $3,960 Implemented
WV0327 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,759 $1,000 Implemented
WV0327 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,613 $2,644 Not Implemented
WV0327 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,057 $696 Implemented
WV0327 # 07 Y:2005 07 2005 RECOVER WASTE HEAT FROM EQUIPMENT $476 $632 Not Implemented