IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

598

matching recommendations
Reset
SIC 2891 Adhesives And Sealants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0230 # 01 Y:2002 01 2002 APPLY A PROTECTIVE COATING TO RACKS AND TANKS $401 $0 Implemented
SF0230 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $537 $474 Implemented
SF0230 # 03 Y:2002 03 2002 REDUCE FLUID FLOW RATES $2,233 $3,211 Not Implemented
SF0230 # 04 Y:2002 04 2002 INCREASE AMOUNT OF CONDENSATE RETURNED $1,207 $2,607 Not Implemented
SF0230 # 05 Y:2002 05 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,420 $3,720 Not Implemented
SF0230 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $689 $1,783 Not Implemented
SF0230 # 07 Y:2002 07 2002 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $8,785 $25,000 Not Implemented
SF0230 # 08 Y:2002 08 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,113 $24,200 Not Implemented
SF0220 # 01 Y:2001 01 2001 REDUCE FLUID FLOW RATES $51,887 $240 Implemented
SF0220 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $924 $0 Not Implemented
SF0220 # 03 Y:2001 03 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $9,165 $2,491 Not Implemented
SF0220 # 04 Y:2001 04 2001 UPGRADE CONTROLS ON COMPRESSORS $305 $257 Implemented
SF0220 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,154 $3,275 Not Implemented
SF0220 # 06 Y:2001 06 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $15,604 $30,000 Not Implemented
SF0220 # 07 Y:2001 07 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,670 $4,200 Not Implemented
NC0215 # 01 Y:2001 01 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,150 $1,000 Not Implemented
NC0215 # 02 Y:2001 02 2001 AIR CONDITION ONLY SPACE NECESSARY $1,330 $4,000 Not Implemented
NC0215 # 03 Y:2001 03 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $91 $65 Not Implemented
NC0215 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $93 $100 Implemented
NC0215 # 05 Y:2001 05 2001 USE ULTRASONIC CLEANING $19,642 $5,000 Not Implemented
NC0215 # 06 Y:2001 06 2001 $240,000 $270,000 Not Implemented
UD0615 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,423 $42,285 Implemented
UD0615 # 02 Y:2001 02 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,160 $0 Implemented
UD0615 # 03 Y:2001 03 2001 INCREASE USE OF AUTOMATION $8,687 $2,415 Not Implemented
UD0615 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,360 $500 Not Implemented