IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

585

matching recommendations
Reset
SIC 2891 Adhesives And Sealants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0220 # 06 Y:2001 06 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $15,604 $30,000 Not Implemented
SF0220 # 07 Y:2001 07 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,670 $4,200 Not Implemented
NC0215 # 01 Y:2001 01 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,150 $1,000 Not Implemented
NC0215 # 02 Y:2001 02 2001 AIR CONDITION ONLY SPACE NECESSARY $1,330 $4,000 Not Implemented
NC0215 # 03 Y:2001 03 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $91 $65 Not Implemented
NC0215 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $93 $100 Implemented
NC0215 # 05 Y:2001 05 2001 USE ULTRASONIC CLEANING $19,642 $5,000 Not Implemented
NC0215 # 06 Y:2001 06 2001 $240,000 $270,000 Not Implemented
UD0615 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,423 $42,285 Implemented
UD0615 # 02 Y:2001 02 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,160 $0 Implemented
UD0615 # 03 Y:2001 03 2001 INCREASE USE OF AUTOMATION $8,687 $2,415 Not Implemented
UD0615 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,360 $500 Not Implemented
UD0615 # 05 Y:2001 05 2001 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,615 $12,800 Not Implemented
UD0615 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $5,831 $8,500 Implemented
UM0160 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,149 $200 Implemented
UM0160 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $582 $50 Implemented
UM0160 # 03 Y:2000 03 2000 USE POWER DURING OFF-PEAK PERIODS $55,632 $22,000 Implemented
UM0160 # 04 Y:2000 04 2000 AIR CONDITION ONLY SPACE NECESSARY $2,800 $220 Implemented
UM0160 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $7,300 $500 Implemented
UM0160 # 06 Y:2000 06 2000 $1,600 $300 Not Implemented
CO0458 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,320 $10,000 Not Implemented
CO0458 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,970 $2,320 Not Implemented
CO0458 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,300 $1,700 Not Implemented
CO0458 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,000 $2,360 Implemented
CO0458 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $270 Implemented