IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

353

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0300 # 11 Y:1997 11 1997 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $585 $0 Implemented
UD0509 # 02 Y:1996 02 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,840 $0 Implemented
UD0509 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,600 $5,000 Implemented
UD0509 # 07 Y:1996 07 1996 USE PHOTOCELL CONTROLS $1,279 $621 Implemented
UD0509 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $512 $1,600 Implemented
UD0509 # 10 Y:1996 10 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,492 $3,080 Implemented
UF0109 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,538 $13,360 Implemented
UF0109 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,068 $2,078 Implemented
UF0109 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $819 $1,911 Implemented
UF0109 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $434 $500 Implemented
AS0130 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,494 $2,571 Implemented
AS0130 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $567 $250 Implemented
GT0510 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,250 $500 Implemented
GT0510 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,880 $5,260 Implemented
GT0510 # 06 Y:1993 06 1993 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $134,080 $250,000 Implemented
GT0510 # 07 Y:1993 07 1993 REPAIR AND ELIMINATE STEAM LEAKS $20,590 $2,400 Implemented
MA0282 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,828 $23,220 Implemented
MA0282 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $6,041 $1,622 Implemented
MA0282 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,625 $2,854 Implemented
MA0282 # 06 Y:1993 06 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $475 $0 Implemented
MA0282 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $430 $230 Implemented
WI0166 # 01 Y:1993 01 1993 CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY $1,244 $0 Implemented
WI0166 # 03 Y:1993 03 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $1,023 $0 Implemented
WI0166 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,344 $1,560 Implemented
AM0163 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $18,300 $35,000 Implemented