Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
735
matching recommendationsSIC | 2899 | Chemical Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0148 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,031 | $300 | Implemented |
LE0148 # 04 Y:2002 | 04 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $692 | $0 | Not Implemented |
LE0148 # 05 Y:2002 | 05 | 2002 | INSULATE FEEDWATER TANK | $121 | $260 | Implemented |
LE0148 # 06 Y:2002 | 06 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,804 | $535 | Not Implemented |
LE0148 # 07 Y:2002 | 07 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,390 | $0 | Not Implemented |
LE0148 # 08 Y:2002 | 08 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,496 | $0 | Not Implemented |
LE0148 # 09 Y:2002 | 09 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,033 | $750 | Implemented |
LE0148 # 10 Y:2002 | 10 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,308 | $990 | Implemented |
LE0148 # 11 Y:2002 | 11 | 2002 | INSTALL OCCUPANCY SENSORS | $210 | $150 | Not Implemented |
LE0148 # 12 Y:2002 | 12 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $690 | $4,095 | Implemented |
SF0247 # 01 Y:2002 | 01 | 2002 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $3,149 | $11,455 | n/a |
SF0247 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,939 | $0 | n/a |
SF0247 # 03 Y:2002 | 03 | 2002 | USE PHOTOCELL CONTROLS | $4,330 | $6,240 | n/a |
SF0247 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,657 | $3,491 | n/a |
SF0247 # 05 Y:2002 | 05 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,588 | $3,019 | n/a |
SF0247 # 06 Y:2002 | 06 | 2002 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $4,500 | $500 | n/a |
SF0247 # 07 Y:2002 | 07 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,923 | $17,600 | n/a |
SF0235 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,373 | $300 | Implemented |
SF0235 # 02 Y:2002 | 02 | 2002 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $5,997 | $206 | Not Implemented |
SF0235 # 03 Y:2002 | 03 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,612 | $3,553 | Implemented |
SF0235 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $298,248 | $112,368 | n/a |
SF0235 # 05 Y:2002 | 05 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,228 | $2,805 | Implemented |
SF0235 # 06 Y:2002 | 06 | 2002 | USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING | $4,004 | $2,461 | Not Implemented |
SF0235 # 07 Y:2002 | 07 | 2002 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $9,286 | $6,700 | Not Implemented |
SF0235 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,822 | $26,538 | Not Implemented |