IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

735

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0261 # 09 Y:2000 09 2000 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $323,237 $750,000 Not Implemented
IA0261 # 10 Y:2000 10 2000 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $43,847 $35,000 Not Implemented
IA0261 # 11 Y:2000 11 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $22,750 $50,000 Not Implemented
UD0607 # 01 Y:2000 01 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $38,566 $50,000 Not Implemented
UD0607 # 02 Y:2000 02 2000 USE RADIANT HEATER FOR SPOT HEATING $16,600 $20,000 Not Implemented
UD0607 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,566 $0 Implemented
UD0607 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,478 $7,485 Implemented
UD0607 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $1,428 $3,135 Implemented
UM0152 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $200 Implemented
UM0152 # 02 Y:2000 02 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $282 $618 Not Implemented
UM0152 # 03 Y:2000 03 2000 USE LESS WASTEFUL PACKAGING $147,272 $0 Implemented
UM0152 # 04 Y:2000 04 2000 RECOVER AND REUSE COOLING WATER $1,649 $3,826 Implemented
UM0152 # 05 Y:2000 05 2000 METER WASTE WATER $1,288 $500 Not Implemented
UM0152 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $13,333 $1,200 Not Implemented
UM0131 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,173 $10,972 n/a
UM0131 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $616 $1,400 n/a
UM0131 # 03 Y:1999 03 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,228 $0 n/a
UM0131 # 04 Y:1999 04 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $202 $510 n/a
UM0131 # 05 Y:1999 05 1999 REPAIR OR REPLACE STEAM TRAPS $2,646 $5,280 n/a
UM0131 # 06 Y:1999 06 1999 INCREASE AMOUNT OF CONDENSATE RETURNED $14,658 $6,690 n/a
UM0131 # 07 Y:1999 07 1999 METER WASTE WATER $2,154 $500 n/a
UM0131 # 08 Y:1999 08 1999 CLEAR AND RENT EXISTING SPACE $63,991 $63,991 n/a
HO0188 # 01 Y:1998 01 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,465 $5,432 Implemented
HO0188 # 02 Y:1998 02 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,007 $4,000 Not Implemented
HO0188 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $1,536 $1,376 Implemented