IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0404 # 03 Y:2022 03 2022 METER WASTE WATER $8,108 $1,533 Implemented
MI0404 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $28,220 $580 Implemented
UF0546 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $40,475 $333,760 Implemented
UF0546 # 03 Y:2020 03 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,492 $4,295 Implemented
UF0543 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,229 $88,272 Implemented
UF0543 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,476 $0 Implemented
UF0543 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $107,586 $164,741 Implemented
UF0532 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,919 $1,400 Implemented
UF0532 # 01 Y:2019 01 2019 RECOVER WASTE HEAT FROM EQUIPMENT $40,174 $25,000 Implemented
UF0532 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,301 $421 Implemented
UF0532 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,352 $25,847 Implemented
UF0532 # 07 Y:2019 07 2019 REDUCE OR ELIMINATE WASTE $19,196 $40,500 Implemented
UF0530 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,402 $0 Implemented
UF0530 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $94,823 $80,000 Implemented
UF0530 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $47,739 $25,000 Implemented
UF0530 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $43,693 $25,000 Implemented
UF0530 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $60,494 $202,420 Implemented
UF0530 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,876 $421 Implemented
MI0246 # 08 Y:2013 08 2013 PAY BILLS ON TIME TO AVOID LATE FEES $945 $240 Implemented
MI0246 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $876 $80 Implemented
MI0246 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,508 $4,420 Implemented
MI0246 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,442 $1,660 Implemented
MI0246 # 02 Y:2013 02 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $14,747 $17,000 Implemented
MI0246 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $30,416 $2,300 Implemented
MI0235 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $2,562 $900 Implemented