Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsSIC | 29 | Petroleum And Coal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0656 # 02 Y:1999 | 02 | 1999 | OPERATE BOILERS ON HIGH FIRE SETTING | $175,220 | $82,400 | Implemented |
TN0656 # 04 Y:1999 | 04 | 1999 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $130,100 | $137,500 | Implemented |
TN0656 # 05 Y:1999 | 05 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $22,000 | $0 | Implemented |
AR0065 # 12 Y:1995 | 12 | 1995 | MODIFY MATERIAL APPLICATION METHODS | $26,000 | $3,000 | Implemented |
AR0065 # 09 Y:1995 | 09 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $824 | $50 | Implemented |
AR0065 # 08 Y:1995 | 08 | 1995 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,959 | $7,500 | Implemented |
AR0065 # 07 Y:1995 | 07 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $705 | $250 | Implemented |
AR0065 # 06 Y:1995 | 06 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,284 | $1,000 | Implemented |
AR0065 # 04 Y:1995 | 04 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,270 | $0 | Implemented |
AR0065 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,192 | $10,190 | Implemented |
AR0065 # 02 Y:1995 | 02 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $761 | $420 | Implemented |
AR0065 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $999 | $410 | Implemented |
TN0289 # 03 Y:1986 | 03 | 1986 | REPAIR AND ELIMINATE STEAM LEAKS | $11,562 | $150 | Implemented |
TN0289 # 04 Y:1986 | 04 | 1986 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $143,750 | $40,000 | Implemented |
TN0289 # 02 Y:1986 | 02 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $32,373 | $4,500 | Implemented |
TN0250 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,460 | $300 | Implemented |
TN0250 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $9,426 | $300 | Implemented |
TN0250 # 01 Y:1985 | 01 | 1985 | INSULATE BARE EQUIPMENT | $30,492 | $4,000 | Implemented |
TN0212 # 06 Y:1984 | 06 | 1984 | INSULATE BARE EQUIPMENT | $1,503 | $498 | Implemented |
TN0212 # 05 Y:1984 | 05 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,547 | $500 | Implemented |
TN0212 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,487 | $400 | Implemented |