Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 29 | Petroleum And Coal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0656 # 01 Y:1999 | 01 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $400,000 | $618,000 | Not Implemented |
TN0656 # 02 Y:1999 | 02 | 1999 | OPERATE BOILERS ON HIGH FIRE SETTING | $175,220 | $82,400 | Implemented |
TN0656 # 03 Y:1999 | 03 | 1999 | MINIMIZE WATER USAGE | $143,010 | $60,900 | Not Implemented |
TN0656 # 04 Y:1999 | 04 | 1999 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $130,100 | $137,500 | Implemented |
TN0656 # 05 Y:1999 | 05 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $22,000 | $0 | Implemented |
TN0656 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $2,020 | $3,560 | Not Implemented |
TN0656 # 07 Y:1999 | 07 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,800 | $2,380 | Not Implemented |
AR0065 # 10 Y:1995 | 10 | 1995 | USE OPTIMUM THICKNESS INSULATION | $8,894 | $6,480 | Not Implemented |
AR0065 # 06 Y:1995 | 06 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,284 | $1,000 | Implemented |
AR0065 # 05 Y:1995 | 05 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,054 | $1,000 | Not Implemented |
AR0065 # 04 Y:1995 | 04 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,270 | $0 | Implemented |
AR0065 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,192 | $10,190 | Implemented |
AR0065 # 02 Y:1995 | 02 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $761 | $420 | Implemented |
AR0065 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $999 | $410 | Implemented |
AR0065 # 07 Y:1995 | 07 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $705 | $250 | Implemented |
AR0065 # 08 Y:1995 | 08 | 1995 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,959 | $7,500 | Implemented |
AR0065 # 09 Y:1995 | 09 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $824 | $50 | Implemented |
AR0065 # 11 Y:1995 | 11 | 1995 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,827 | $12,500 | Not Implemented |
AR0065 # 12 Y:1995 | 12 | 1995 | MODIFY MATERIAL APPLICATION METHODS | $26,000 | $3,000 | Implemented |
TN0289 # 01 Y:1986 | 01 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $64,485 | $105,000 | Not Implemented |
TN0289 # 04 Y:1986 | 04 | 1986 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $143,750 | $40,000 | Implemented |
TN0289 # 03 Y:1986 | 03 | 1986 | REPAIR AND ELIMINATE STEAM LEAKS | $11,562 | $150 | Implemented |
TN0289 # 02 Y:1986 | 02 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $32,373 | $4,500 | Implemented |
TN0250 # 01 Y:1985 | 01 | 1985 | INSULATE BARE EQUIPMENT | $30,492 | $4,000 | Implemented |
TN0250 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,460 | $300 | Implemented |