IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
SIC 29 Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0247 # 08 Y:2013 08 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $870 $347 Implemented
MI0247 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,108 $80 Not Implemented
MI0247 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,908 $2,520 Implemented
MI0247 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,525 $1,660 Implemented
MI0247 # 03 Y:2013 03 2013 INCREASE EFFICIENCY OF TRUCKS $7,110 $5,800 Not Implemented
MI0247 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $118,483 $20,790 Not Implemented
MI0247 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,027 $8,010 Implemented
MI0120 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,982 $56 Not Implemented
MI0120 # 04 Y:2006 04 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,956 $5,024 Not Implemented
MI0120 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,318 $0 Not Implemented
MI0120 # 02 Y:2006 02 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $145,490 $5,540 Not Implemented
MI0120 # 01 Y:2006 01 2006 IMPROVE COMBUSTION CONTROL CAPABILITY $178,061 $75,000 Not Implemented
UF0368 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,231 $3,846 Implemented
UF0368 # 03 Y:2005 03 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,367 $1,437 Implemented
UF0368 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,437 $1,407 Implemented
UF0368 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $194 $65 Implemented
UF0368 # 06 Y:2005 06 2005 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $340 $316 Implemented
UF0368 # 07 Y:2005 07 2005 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,000 $2,304 Implemented
UF0368 # 08 Y:2005 08 2005 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $6,656 $5,000 Implemented
UF0368 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $47,282 $35,000 Not Implemented
MI0110 # 01 Y:2005 01 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $122,911 $75,000 Not Implemented
MI0110 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $117,785 $2,470 Not Implemented
MI0110 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $49,464 $16,000 Not Implemented
MI0110 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,676 $1,110 Not Implemented
MI0110 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $845 $780 Not Implemented