IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,377

matching recommendations
Reset
SIC 29 Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0118 # 04 Y:1997 04 1997 OPTIMIZE PLANT POWER FACTOR $1,631 $2,409 Not Implemented
SF0118 # 05 Y:1997 05 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,007 $140,000 Not Implemented
SF0118 # 06 Y:1997 06 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $369 $365 Implemented
SF0118 # 07 Y:1997 07 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,770 $14,926 Implemented
SF0118 # 08 Y:1997 08 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,598 $14,138 Implemented
SF0118 # 09 Y:1997 09 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $499 $250 Implemented
SF0118 # 10 Y:1997 10 1997 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $4,583 $500 Implemented
SF0118 # 11 Y:1997 11 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $46,724 $32,060 Implemented
OR0294 # 01 Y:1997 01 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,710 $500 Implemented
OR0294 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,320 $500 Implemented
OR0294 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,520 $1,000 Not Implemented
OR0294 # 04 Y:1997 04 1997 UPGRADE CONTROLS ON COMPRESSORS $1,540 $3,700 Not Implemented
OR0294 # 05 Y:1997 05 1997 OPTIMIZE PLANT POWER FACTOR $861 $2,600 Not Implemented
OR0294 # 06 Y:1997 06 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,133 $3,516 Implemented
OR0294 # 07 Y:1997 07 1997 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $8,920 $80,000 Not Implemented
OR0294 # 08 Y:1997 08 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $9,140 $80,000 Not Implemented
OR0294 # 09 Y:1997 09 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $117,450 $206,000 Not Implemented
OR0294 # 10 Y:1997 10 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $11,700 $22,500 Not Implemented
OR0294 # 11 Y:1997 11 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,160 $0 Implemented
OR0290 # 01 Y:1997 01 1997 MOVE PRODUCT USING MECHANICAL MEANS $7,230 $20,000 Not Implemented
OR0290 # 02 Y:1997 02 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,870 $5,000 Not Implemented
OR0290 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $349 $2,216 Implemented
OR0290 # 04 Y:1997 04 1997 RECOVER AND REUSE WASTE MATERIAL $27,000 $260,000 Not Implemented
UD0493 # 01 Y:1996 01 1996 KEEP BOILER TUBES CLEAN $2,375 $500 Implemented
UD0493 # 02 Y:1996 02 1996 REPAIR OR REPLACE STEAM TRAPS $10,368 $9,000 Implemented