IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,377

matching recommendations
Reset
SIC 29 Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0243 # 03 Y:1995 03 1995 REPLACE BOILER $3,712 $12,000 Not Implemented
WI0243 # 04 Y:1995 04 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,111 $6,000 Not Implemented
WI0243 # 05 Y:1995 05 1995 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,773 $1,500 Implemented
WI0243 # 06 Y:1995 06 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,126 $538 Not Implemented
WI0243 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $898 $1,796 Implemented
WI0243 # 08 Y:1995 08 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $445 $700 Not Implemented
WI0243 # 09 Y:1995 09 1995 INSULATE BARE EQUIPMENT $248 $672 Not Implemented
WI0243 # 10 Y:1995 10 1995 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $13,399 $9,000 Not Implemented
OD0036 # 01 Y:1995 01 1995 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $12,439 $45,026 Not Implemented
OD0036 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $7,287 $5,655 Not Implemented
OD0036 # 03 Y:1995 03 1995 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,704 $20,250 Not Implemented
OD0036 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,181 $800 Not Implemented
OD0036 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,206 $2,885 Not Implemented
OD0036 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $1,256 $960 Not Implemented
UM0023 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,365 $9,035 Not Implemented
UM0023 # 02 Y:1995 02 1995 COVER OPEN TANKS $12,514 $13,088 Implemented
UM0023 # 03 Y:1995 03 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $684 $200 Not Implemented
UM0023 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $2,370 $481 Not Implemented
UM0023 # 05 Y:1995 05 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $3,126 $1,990 Not Implemented
UM0023 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $3,012 $471 Not Implemented
CO0322 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $131,920 $35,180 Not Implemented
CO0322 # 02 Y:1995 02 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,530 $85,020 Not Implemented
CO0322 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $12,530 $830 Implemented
CO0322 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $12,270 $16,040 Not Implemented
CO0322 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,570 $19,930 Implemented