Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsSIC | 29 | Petroleum And Coal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0280 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,752 | $7,431 | n/a |
UA0280 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,472 | $1,000 | n/a |
UA0280 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,180 | $3,163 | n/a |
UA0280 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $4,338 | $353 | n/a |
UA0269 # 07 Y:2023 | 07 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $751 | $251 | Not Implemented |
UA0269 # 06 Y:2023 | 06 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $2,642 | $297 | Not Implemented |
UA0269 # 05 Y:2023 | 05 | 2023 | USE PHOTOCELL CONTROLS | $2,019 | $2,438 | Not Implemented |
UA0269 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,902 | $3,140 | Not Implemented |
UA0269 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,634 | $842 | Not Implemented |
UA0269 # 01 Y:2023 | 01 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $147,247 | $186,762 | Not Implemented |
UA0269 # 02 Y:2023 | 02 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $21,248 | $98,929 | Not Implemented |
UA3008 # 02 Y:2010 | 02 | 2010 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,598 | $17,500 | Implemented |
UA3008 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,619 | $1,500 | Not Implemented |
UA3008 # 05 Y:2010 | 05 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $497 | $340 | Not Implemented |
UA3008 # 01 Y:2010 | 01 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $6,109 | $337 | Implemented |
UA3008 # 03 Y:2010 | 03 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,470 | $2,149 | Implemented |
UA3008 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,485 | $640 | Not Implemented |
UA3008 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,004 | $16,161 | Not Implemented |
UA3008 # 04 Y:2010 | 04 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $12,090 | $20,526 | Not Implemented |
UA0033 # 04 Y:2009 | 04 | 2009 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $61,530 | $16,083 | Not Implemented |
UA0033 # 03 Y:2009 | 03 | 2009 | INSULATE BARE EQUIPMENT | $570 | $2,548 | Not Implemented |
UA0033 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $96,325 | $7,930 | Not Implemented |
UA0033 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $970 | $700 | Not Implemented |
UA0008 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,848 | $0 | Implemented |
UA0008 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,233 | $1,400 | Implemented |