IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
SIC 29 Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2509 # 04 Y:2025 04 2025 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $127,011 $200,000 n/a
LS2509 # 02 Y:2025 02 2025 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $12,547 $16,300 n/a
LS2509 # 07 Y:2025 07 2025 INSULATE BARE EQUIPMENT $214,970 $1,500,000 n/a
LS2509 # 01 Y:2025 01 2025 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $40,834 $25,000 n/a
LS2509 # 05 Y:2025 05 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,218 $2,700 n/a
LS2509 # 03 Y:2025 03 2025 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $56,956 $80,000 n/a
LS2509 # 06 Y:2025 06 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $53,529 $144,549 n/a
LS2405 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,417 $135 Implemented
LS2405 # 01 Y:2024 01 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,278 $0 Implemented
LS2405 # 05 Y:2024 05 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $155,225 $550,000 Implemented
LS2405 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,023 $50 Not Implemented
LS2405 # 06 Y:2024 06 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $129,015 $600,000 Not Implemented
LS2405 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,207 $25,301 Implemented
LS2214 # 01 Y:2022 01 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $137 $0 Implemented
LS2214 # 05 Y:2022 05 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $53,187 $50,000 Implemented
LS2214 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,189 $270 Implemented
LS2214 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $63 $150 Not Implemented
LS2214 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $226 $25 Not Implemented
LS2214 # 04 Y:2022 04 2022 INSTALL TIMERS AND/OR THERMOSTATS $217 $38 Implemented
LS2214 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,374 $1,394 Not Implemented
LL0275 # 01 Y:2007 01 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $9,761 $500 Not Implemented
LL0275 # 03 Y:2007 03 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,372 $240 Implemented
LL0275 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,791 $690 Implemented
LL0275 # 05 Y:2007 05 2007 USE PHOTOCELL CONTROLS $1,014 $90 Not Implemented
LL0275 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $523 $507 Not Implemented