Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 29 | Petroleum And Coal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0272 # 11 Y:2025 | 11 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,250 | $11,200 | n/a |
UU0272 # 10 Y:2025 | 10 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,500 | $600 | n/a |
UU0272 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,600 | $207,000 | n/a |
UU0272 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $890 | $410 | n/a |
UU0272 # 07 Y:2025 | 07 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $62,900 | $32,400 | n/a |
UU0272 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,170 | $26,600 | n/a |
UU0272 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,950 | $23,600 | n/a |
UU0272 # 04 Y:2025 | 04 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $54,700 | $110,000 | n/a |
UU0272 # 03 Y:2025 | 03 | 2025 | REDUCE EXCESSIVE BOILER BLOWDOWN | $20,800 | $16,300 | n/a |
UU0272 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $31,500 | $18,800 | n/a |
UU0272 # 01 Y:2025 | 01 | 2025 | Hire Energy Manager | $66,000 | $13,000 | n/a |
NV0160 # 07 Y:2000 | 07 | 2000 | CHANGE PRODUCT SPECS | $5,112 | $0 | n/a |
NV0160 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $169,964 | $15,000 | n/a |
NV0160 # 06 Y:2000 | 06 | 2000 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,742 | $125 | n/a |
NV0160 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $880 | $585 | n/a |
NV0160 # 04 Y:2000 | 04 | 2000 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $4,907 | $2,175 | n/a |
NV0160 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,918 | $8,274 | n/a |
NV0160 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,666 | $240 | n/a |
NV0160 # 01 Y:2000 | 01 | 2000 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $8,107 | $370 | n/a |
NV0131 # 01 Y:1999 | 01 | 1999 | INSULATE BARE EQUIPMENT | $105 | $200 | Not Implemented |
NV0131 # 07 Y:1999 | 07 | 1999 | INSTALL SYSTEM TO COLLECT SCRAP | $24,024 | $20,320 | Not Implemented |
NV0131 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $444 | $50 | Implemented |
NV0131 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $327 | $0 | Implemented |
NV0131 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $111 | $80 | Implemented |
NV0131 # 03 Y:1999 | 03 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,277 | $638 | Implemented |