Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsSIC | 29 | Petroleum And Coal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0235 # 01 Y:1999 | 01 | 1999 | OPTIMIZE PLANT POWER FACTOR | $18,187 | $21,040 | Not Implemented |
UL0235 # 02 Y:1999 | 02 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,509 | $2,875 | Implemented |
UF0231 # 02 Y:1999 | 02 | 1999 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,140 | $2,650 | Not Implemented |
UF0231 # 03 Y:1999 | 03 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,596 | $450 | Implemented |
UF0231 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,328 | $4,141 | Not Implemented |
UF0231 # 05 Y:1999 | 05 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,198 | $1,000 | Implemented |
UF0231 # 06 Y:1999 | 06 | 1999 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $62,712 | $2,200 | Not Implemented |
UF0231 # 07 Y:1999 | 07 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,200 | $0 | Implemented |
UF0231 # 08 Y:1999 | 08 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,562 | $0 | Implemented |
UF0231 # 04 Y:1999 | 04 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $12,394 | $42,085 | Not Implemented |
NV0132 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,139 | $1,760 | Not Implemented |
NV0132 # 06 Y:1999 | 06 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,012 | $0 | Implemented |
NV0132 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,392 | $39,424 | Implemented |
NV0132 # 01 Y:1999 | 01 | 1999 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $78,922 | $210,000 | Not Implemented |
NV0132 # 04 Y:1999 | 04 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,402 | $2,405 | Not Implemented |
NV0132 # 05 Y:1999 | 05 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,219 | $1,590 | Not Implemented |
NV0132 # 07 Y:1999 | 07 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $172,243 | $54,000 | Implemented |
NV0131 # 01 Y:1999 | 01 | 1999 | INSULATE BARE EQUIPMENT | $105 | $200 | Not Implemented |
NV0131 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $1,146 | $1,933 | Not Implemented |
NV0131 # 03 Y:1999 | 03 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,277 | $638 | Implemented |
NV0131 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $111 | $80 | Implemented |
NV0131 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $327 | $0 | Implemented |
NV0131 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $444 | $50 | Implemented |
NV0131 # 07 Y:1999 | 07 | 1999 | INSTALL SYSTEM TO COLLECT SCRAP | $24,024 | $20,320 | Not Implemented |
TN0656 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $2,020 | $3,560 | Not Implemented |