Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 29 | Petroleum And Coal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NV0160 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $169,964 | $15,000 | n/a |
NV0160 # 07 Y:2000 | 07 | 2000 | CHANGE PRODUCT SPECS | $5,112 | $0 | n/a |
NV0160 # 06 Y:2000 | 06 | 2000 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,742 | $125 | n/a |
NV0160 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $880 | $585 | n/a |
NV0160 # 04 Y:2000 | 04 | 2000 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $4,907 | $2,175 | n/a |
NV0160 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,918 | $8,274 | n/a |
NV0160 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,666 | $240 | n/a |
NV0160 # 01 Y:2000 | 01 | 2000 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $8,107 | $370 | n/a |
ME0293 # 06 Y:2000 | 06 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $30,516 | $15,070 | Not Implemented |
ME0293 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $262 | $200 | Implemented |
ME0293 # 04 Y:2000 | 04 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,183 | $0 | Implemented |
ME0293 # 03 Y:2000 | 03 | 2000 | INSULATE BARE EQUIPMENT | $4,661 | $7,900 | Not Implemented |
ME0293 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,138 | $10,890 | Not Implemented |
ME0293 # 01 Y:2000 | 01 | 2000 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $19,379 | $38,000 | Not Implemented |
SF0196 # 02 Y:2000 | 02 | 2000 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $67 | $287 | Implemented |
SF0196 # 04 Y:2000 | 04 | 2000 | COMBINE UTILITY METERS | $1,738 | $60 | Implemented |
SF0196 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,663 | $6,340 | Implemented |
SF0196 # 01 Y:2000 | 01 | 2000 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $648 | $860 | Implemented |
TP0019 # 04 Y:2000 | 04 | 2000 | INSTALL OCCUPANCY SENSORS | $190 | $308 | Implemented |
TP0019 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $368 | $2,161 | Implemented |
TP0019 # 02 Y:2000 | 02 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $3,622 | $20,000 | Not Implemented |
TP0019 # 01 Y:2000 | 01 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $43,452 | $10,000 | Not Implemented |
SD0236 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,527 | $8,000 | Not Implemented |
SD0236 # 02 Y:2000 | 02 | 2000 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $271,210 | $1,150,000 | Implemented |
SD0236 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,260 | $17,300 | Not Implemented |