IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

911

matching recommendations
Reset
SIC 295 Asphalt Paving And Roofing Materials
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0301 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $24,209 $186,605 n/a
IC0301 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,652 $0 n/a
IC0301 # 07 Y:2024 07 2024 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $13,766 $3,820 n/a
IC0301 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,886 $205 n/a
IC0301 # 02 Y:2024 02 2024 CONTRACT A WOOD PALLET RECYCLING COMPANY $26,388 $3,600 n/a
IC0301 # 08 Y:2024 08 2024 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $2,673 $890 n/a
IC0301 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,042 $205 n/a
IC0301 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,487 $0 n/a
UF0605 # 04 Y:2023 04 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $3,043 $2,800 Implemented
UF0605 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $108,422 $322,608 Not Implemented
UF0605 # 05 Y:2023 05 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $1,444,605 $0 Implemented
UF0605 # 06 Y:2023 06 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $5,654 $20,000 Implemented
UF0605 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,825 $11,200 Implemented
UF0605 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,052 $10,000 Implemented
UA0280 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,472 $1,000 n/a
UA0280 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $4,338 $353 n/a
UA0280 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,180 $3,163 n/a
UA0280 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,752 $7,431 n/a
UA0269 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,902 $3,140 Not Implemented
UA0269 # 07 Y:2023 07 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $751 $251 Not Implemented
UA0269 # 06 Y:2023 06 2023 INSTALL TIMERS AND/OR THERMOSTATS $2,642 $297 Not Implemented
UA0269 # 05 Y:2023 05 2023 USE PHOTOCELL CONTROLS $2,019 $2,438 Not Implemented
UA0269 # 02 Y:2023 02 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $21,248 $98,929 Not Implemented
UA0269 # 01 Y:2023 01 2023 RECOVER WASTE HEAT FROM EQUIPMENT $147,247 $186,762 Not Implemented
UA0269 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $3,634 $842 Not Implemented